Solar power plant · Kern, CA

RE Gaskell West 2 LLC

RE Gaskell West 2 LLC is a 65 MW solar power plant in Kern County, California, operated by RE Gaskell West LLC. Its oldest generator still running came online in 2023. In 2025 it generated 112 GWh, about what 19,000 average California homes use in a year.

Capacity65 MWNameplate, September 2026
Generated112 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators2Oldest from 2023

RE Gaskell West 2 LLC in context

Among the 967 solar plants in California in the EIA's inventory, it is the 121st largest, about 0.2% of the state's 32 GW of solar capacity.

Kern County has 268 power plants of 1 MW or more with 19 GW in all; RE Gaskell West 2 LLC is 0% of that and the 34th largest of 158 solar plants there.

Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150202320242025GWh 112
050100150202320242025112

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

RE Gaskell West 2 LLC (outlined) and other plants in Kern County, shaded. 34.835, -118.551.

Plant facts

Operator
RE Gaskell West LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Kern County, CA
EIA plant ID
61446
  • Solar45 MW69%
  • Storage20 MW31%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV2 Solar Photovoltaic 45 MW 2023 –
BA2 Batteries 20 MW · 20 MWh 2023 –

Questions

RE Gaskell West 2 LLC, answered

How much power does RE Gaskell West 2 LLC produce?

RE Gaskell West 2 LLC has 65 MW of capacity from 2 generators. In 2025 it generated 112 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does RE Gaskell West 2 LLC power?

Its 2025 output of 112 GWh equals the yearly electricity use of about 19,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is RE Gaskell West 2 LLC?

RE Gaskell West 2 LLC is in Kern County, California, at about 34.835°, -118.551°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Who operates RE Gaskell West 2 LLC?

It is operated by RE Gaskell West LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did RE Gaskell West 2 LLC open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.