Solar power plant · Imperial, CA
Imperial Valley Solar Company 1 LLC
Imperial Valley Solar Company 1 LLC is a 23 MW solar power plant in Imperial County, California, operated by Imperial Irrigation District. Its oldest generator still running came online in 2012. In 2025 it generated 33 GWh, about what 5,600 average California homes use in a year.
Imperial Valley Solar Company 1 LLC in context
Among the 967 solar plants in California in the EIA's inventory, it is the 160th largest, about 0.1% of the state's 32 GW of solar capacity.
Imperial County has 73 power plants of 1 MW or more with 4.6 GW in all; Imperial Valley Solar Company 1 LLC is 1% of that and the 17th largest of 36 solar plants there.
Its capacity factor of 16% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Imperial Valley Solar Company 1 LLC (outlined) and other plants in Imperial County, shaded. 33.246, -115.497.
Plant facts
- Operator
- Imperial Irrigation District
- Sector
- Electric Utility
- Grid operator
- IID
- County
- Imperial County, CA
- EIA plant ID
- 58062
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 0001 | Solar Photovoltaic | 23 MW | 2012 | – |
Questions
Imperial Valley Solar Company 1 LLC, answered
How much power does Imperial Valley Solar Company 1 LLC produce?
Imperial Valley Solar Company 1 LLC has 23 MW of capacity from one generator. In 2025 it generated 33 GWh, 16% of the most it could have made running flat out all year (its capacity factor).
How many homes does Imperial Valley Solar Company 1 LLC power?
Its 2025 output of 33 GWh equals the yearly electricity use of about 5,600 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Imperial Valley Solar Company 1 LLC?
Imperial Valley Solar Company 1 LLC is in Imperial County, California, at about 33.246°, -115.497°. It is one of 73 power plants of 1 MW or more in the county. The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.
Who operates Imperial Valley Solar Company 1 LLC?
It is operated by Imperial Irrigation District (EIA sector: Electric Utility), and it feeds balancing authority IID.
When did Imperial Valley Solar Company 1 LLC open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.