Hydro power plant · Kern, CA

Kern Canyon

Kern Canyon is a 12 MW hydro power plant in Kern County, California, operated by Kern and Tule Hydro LLC. Its oldest generator still running came online in 1921.

Capacity12 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 1921

Kern Canyon in context

Among the 238 hydro plants in California in the EIA's inventory, it is the 106th largest, about 0.1% of the state's 10 GW of hydro capacity.

Kern County has 268 power plants of 1 MW or more with 19 GW in all; Kern Canyon is 0% of that and the 5th largest of 5 hydro plants there.

The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Where it is

Kern Canyon (outlined) and other plants in Kern County, shaded. 35.441, -118.796.

Plant facts

Operator
Kern and Tule Hydro LLC
Sector
Electric Utility
Grid operator
CISO
County
Kern County, CA
EIA plant ID
7911
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Conventional Hydroelectric 12 MW 1921 –

Questions

Kern Canyon, answered

How much power does Kern Canyon produce?

Kern Canyon has 12 MW of capacity from one generator. No full year of generation is reported yet.

Where is Kern Canyon?

Kern Canyon is in Kern County, California, at about 35.441°, -118.796°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Who operates Kern Canyon?

It is operated by Kern and Tule Hydro LLC (EIA sector: Electric Utility), and it feeds the California ISO.

When did Kern Canyon open?

Its oldest generator still running came online in 1921.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.