Axium Modesto Solar is a 25 MW solar power plant in Stanislaus County, California, operated by Axium US Solar Holdings LLC. Its oldest generator still running came online in 2012. In 2025 it generated 53 GWh, about what 9,000 average California homes use in a year.

Capacity25 MWNameplate, September 2026
Generated53 GWhIn 2025
Capacity factor24%Share of the most it could make, 2025
Generators1Oldest from 2012

Axium Modesto Solar in context

Among the 967 solar plants in California in the EIA's inventory, it is the 159th largest, about 0.1% of the state's 32 GW of solar capacity.

Stanislaus County has 20 power plants of 1 MW or more with 1.5 GW in all; Axium Modesto Solar is 2% of that and the 4th largest of 7 solar plants there.

Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Stanislaus County goes 0.4 hours a year without power, the 56th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608020182019202020212022202320242025GWh 53
020406080201920212023202553

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Axium Modesto Solar (outlined) and other plants in Stanislaus County, shaded. 37.734, -120.996.

Plant facts

Operator
Axium US Solar Holdings LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Stanislaus County, CA
EIA plant ID
58039
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 25 MW 2012 –

Questions

Axium Modesto Solar, answered

How much power does Axium Modesto Solar produce?

Axium Modesto Solar has 25 MW of capacity from one generator. In 2025 it generated 53 GWh, 24% of the most it could have made running flat out all year (its capacity factor).

How many homes does Axium Modesto Solar power?

Its 2025 output of 53 GWh equals the yearly electricity use of about 9,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Axium Modesto Solar?

Axium Modesto Solar is in Stanislaus County, California, at about 37.734°, -120.996°. It is one of 20 power plants of 1 MW or more in the county. The average electricity customer in Stanislaus County goes 0.4 hours a year without power, the 56th most of 56 counties in California. The county's page has the full outage record.

Who operates Axium Modesto Solar?

It is operated by Axium US Solar Holdings LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Axium Modesto Solar open?

Its oldest generator still running came online in 2012.