Biomass power plant · Fresno, CA

Covanta Mendota

Covanta Mendota is a 28 MW biomass power plant in Fresno County, California, operated by Clean Energy Systems Mendota. Its oldest generator still running came online in 1989.

Capacity28 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 1989

Covanta Mendota in context

Among the 157 other-fuel plants in California in the EIA's inventory, it is the 47th largest, about 0.6% of the state's 4.9 GW of other-fuel capacity.

Fresno County has 105 power plants of 1 MW or more with 5.9 GW in all; Covanta Mendota is 0% of that and the largest of 2 biomass plants there.

The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.

Where it is

Covanta Mendota (outlined) and other plants in Fresno County, shaded. 36.756, -120.365.

Plant facts

Operator
Clean Energy Systems Mendota
Sector
Commercial Non-CHP
Grid operator
CISO
County
Fresno County, CA
EIA plant ID
10837
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Wood/Wood Waste Biomass 28 MW 1989 –

Questions

Covanta Mendota, answered

How much power does Covanta Mendota produce?

Covanta Mendota has 28 MW of capacity from one generator. No full year of generation is reported yet.

Where is Covanta Mendota?

Covanta Mendota is in Fresno County, California, at about 36.756°, -120.365°. It is one of 105 power plants of 1 MW or more in the county. The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.

Who operates Covanta Mendota?

It is operated by Clean Energy Systems Mendota (EIA sector: Commercial Non-CHP), and it feeds the California ISO.

When did Covanta Mendota open?

Its oldest generator still running came online in 1989.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.