Solar power plant · Orange, CA
BCE Los Alamitos 2
BCE Los Alamitos 2 is a 20 MW solar power plant in Orange County, California, operated by Bright Canyon Energy. Its oldest generator still running came online in 2023.
BCE Los Alamitos 2 in context
Among the 967 solar plants in California in the EIA's inventory, it is the 245th largest, about 0.1% of the state's 32 GW of solar capacity.
Orange County has 44 power plants of 1 MW or more with 1.8 GW in all; BCE Los Alamitos 2 is 1% of that and the largest of 8 solar plants there.
The average electricity customer in Orange County goes 2.3 hours a year without power, the 55th most of 56 counties in California. The county's page has the full outage record.
Where it is
BCE Los Alamitos 2 (outlined) and other plants in Orange County, shaded. 33.784, -118.051.
Plant facts
- Operator
- Bright Canyon Energy
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Orange County, CA
- EIA plant ID
- 66532
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BCE21 | Solar Photovoltaic | 10 MW | 2023 | – |
| BCE22 | Batteries | 10 MW · 20 MWh | 2023 | – |
Nearby
Other plants in Orange County
Questions
BCE Los Alamitos 2, answered
How much power does BCE Los Alamitos 2 produce?
BCE Los Alamitos 2 has 20 MW of capacity from 2 generators. No full year of generation is reported yet.
Where is BCE Los Alamitos 2?
BCE Los Alamitos 2 is in Orange County, California, at about 33.784°, -118.051°. It is one of 44 power plants of 1 MW or more in the county. The average electricity customer in Orange County goes 2.3 hours a year without power, the 55th most of 56 counties in California. The county's page has the full outage record.
Who operates BCE Los Alamitos 2?
It is operated by Bright Canyon Energy (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did BCE Los Alamitos 2 open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Methodology.