Solar Borrego I

Solar Borrego I is a 26 MW solar power plant in San Diego County, California, operated by NRG Solar Borrego I. Its oldest generator still running came online in 2013. In 2025 it generated 61 GWh, about what 10,000 average California homes use in a year.

Capacity26 MWNameplate, September 2026
Generated61 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2013

Solar Borrego I in context

Among the 967 solar plants in California in the EIA's inventory, it is the 157th largest, about 0.1% of the state's 32 GW of solar capacity.

San Diego County has 107 power plants of 1 MW or more with 5.1 GW in all; Solar Borrego I is 1% of that and the largest of 33 solar plants there.

Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608020182019202020212022202320242025GWh 61
020406080201920212023202561

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Solar Borrego I (outlined) and other plants in San Diego County, shaded. 33.299, -116.351.

Plant facts

Operator
NRG Solar Borrego I
Sector
IPP Non-CHP
Grid operator
CISO
County
San Diego County, CA
EIA plant ID
57455
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SB1 Solar Photovoltaic 26 MW 2013 –

Questions

Solar Borrego I, answered

How much power does Solar Borrego I produce?

Solar Borrego I has 26 MW of capacity from one generator. In 2025 it generated 61 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does Solar Borrego I power?

Its 2025 output of 61 GWh equals the yearly electricity use of about 10,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Solar Borrego I?

Solar Borrego I is in San Diego County, California, at about 33.299°, -116.351°. It is one of 107 power plants of 1 MW or more in the county. The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.

Who operates Solar Borrego I?

It is operated by NRG Solar Borrego I (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Solar Borrego I open?

Its oldest generator still running came online in 2013.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.