Natural gas power plant · Kern, CA
Mid-Set Cogeneration
Mid-Set Cogeneration is a 39 MW natural gas power plant in Kern County, California, operated by Mid Set Cogeneration Co. Its oldest generator still running came online in 1989.
Mid-Set Cogeneration in context
Among the 304 natural gas plants in California in the EIA's inventory, it is the 152nd largest, about 0.1% of the state's 41 GW of natural gas capacity.
Kern County has 268 power plants of 1 MW or more with 19 GW in all; Mid-Set Cogeneration is 0% of that and the 20th largest of 36 natural gas plants there.
The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Where it is
Mid-Set Cogeneration (outlined) and other plants in Kern County, shaded. 35.195, -119.571.
Plant facts
- Operator
- Mid Set Cogeneration Co
- Sector
- IPP CHP
- Grid operator
- CISO
- County
- Kern County, CA
- EIA plant ID
- 10501
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| K100 | Natural Gas Fired Combustion Turbine | 39 MW | 1989 | – |
Nearby
Other plants in Kern County
Questions
Mid-Set Cogeneration, answered
How much power does Mid-Set Cogeneration produce?
Mid-Set Cogeneration has 39 MW of capacity from one generator. No full year of generation is reported yet.
Where is Mid-Set Cogeneration?
Mid-Set Cogeneration is in Kern County, California, at about 35.195°, -119.571°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Who operates Mid-Set Cogeneration?
It is operated by Mid Set Cogeneration Co (EIA sector: IPP CHP), and it feeds the California ISO.
When did Mid-Set Cogeneration open?
Its oldest generator still running came online in 1989.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.