Solar power plant · Fresno, CA
Giffen Solar Park
Giffen Solar Park is a 20 MW solar power plant in Fresno County, California, operated by Giffen Solar Park, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 20 GWh, about what 3,300 average California homes use in a year.
Giffen Solar Park in context
Among the 967 solar plants in California in the EIA's inventory, it is the 200th largest, about 0.1% of the state's 32 GW of solar capacity.
Fresno County has 105 power plants of 1 MW or more with 5.9 GW in all; Giffen Solar Park is 0% of that and the 17th largest of 73 solar plants there.
Its capacity factor of 11% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Giffen Solar Park (outlined) and other plants in Fresno County, shaded. 36.545, -120.316.
Plant facts
- Operator
- Giffen Solar Park, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Fresno County, CA
- EIA plant ID
- 59522
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| FRGSP | Solar Photovoltaic | 20 MW | 2017 | – |
Questions
Giffen Solar Park, answered
How much power does Giffen Solar Park produce?
Giffen Solar Park has 20 MW of capacity from one generator. In 2025 it generated 20 GWh, 11% of the most it could have made running flat out all year (its capacity factor).
How many homes does Giffen Solar Park power?
Its 2025 output of 20 GWh equals the yearly electricity use of about 3,300 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Giffen Solar Park?
Giffen Solar Park is in Fresno County, California, at about 36.545°, -120.316°. It is one of 105 power plants of 1 MW or more in the county. The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Who operates Giffen Solar Park?
It is operated by Giffen Solar Park, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Giffen Solar Park open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.