Solar power plant · Kern, CA
Regulus Solar Project
Regulus Solar Project is a 60 MW solar power plant in Kern County, California, operated by Regulus Solar, LLC. Its oldest generator still running came online in 2014. In 2025 it generated 150 GWh, about what 25,000 average California homes use in a year.
Regulus Solar Project in context
Among the 967 solar plants in California in the EIA's inventory, it is the 123rd largest, about 0.2% of the state's 32 GW of solar capacity.
Kern County has 268 power plants of 1 MW or more with 19 GW in all; Regulus Solar Project is 0% of that and the 35th largest of 158 solar plants there.
Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Regulus Solar Project (outlined) and other plants in Kern County, shaded. 35.300, -118.852.
Plant facts
- Operator
- Regulus Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Kern County, CA
- EIA plant ID
- 57650
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| FRV4 | Solar Photovoltaic | 60 MW | 2014 | – |
Nearby
Other plants in Kern County
Questions
Regulus Solar Project, answered
How much power does Regulus Solar Project produce?
Regulus Solar Project has 60 MW of capacity from one generator. In 2025 it generated 150 GWh, 28% of the most it could have made running flat out all year (its capacity factor).
How many homes does Regulus Solar Project power?
Its 2025 output of 150 GWh equals the yearly electricity use of about 25,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Regulus Solar Project?
Regulus Solar Project is in Kern County, California, at about 35.300°, -118.852°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Who operates Regulus Solar Project?
It is operated by Regulus Solar, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Regulus Solar Project open?
Its oldest generator still running came online in 2014.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.