Solar power plant · Kern, CA

Regulus Solar Project

Regulus Solar Project is a 60 MW solar power plant in Kern County, California, operated by Regulus Solar, LLC. Its oldest generator still running came online in 2014. In 2025 it generated 150 GWh, about what 25,000 average California homes use in a year.

Capacity60 MWNameplate, September 2026
Generated150 GWhIn 2025
Capacity factor28%Share of the most it could make, 2025
Generators1Oldest from 2014

Regulus Solar Project in context

Among the 967 solar plants in California in the EIA's inventory, it is the 123rd largest, about 0.2% of the state's 32 GW of solar capacity.

Kern County has 268 power plants of 1 MW or more with 19 GW in all; Regulus Solar Project is 0% of that and the 35th largest of 158 solar plants there.

Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020182019202020212022202320242025GWh 150
0501001502002019202120232025150

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Regulus Solar Project (outlined) and other plants in Kern County, shaded. 35.300, -118.852.

Plant facts

Operator
Regulus Solar, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Kern County, CA
EIA plant ID
57650
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
FRV4 Solar Photovoltaic 60 MW 2014 –

Questions

Regulus Solar Project, answered

How much power does Regulus Solar Project produce?

Regulus Solar Project has 60 MW of capacity from one generator. In 2025 it generated 150 GWh, 28% of the most it could have made running flat out all year (its capacity factor).

How many homes does Regulus Solar Project power?

Its 2025 output of 150 GWh equals the yearly electricity use of about 25,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Regulus Solar Project?

Regulus Solar Project is in Kern County, California, at about 35.300°, -118.852°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Who operates Regulus Solar Project?

It is operated by Regulus Solar, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Regulus Solar Project open?

Its oldest generator still running came online in 2014.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.