Storage power plant · Kern, CA
AVEP BESS
AVEP BESS is a 126 MW storage power plant in Kern County, California, operated by Leeward Asset Management, LLC. Its oldest generator still running came online in 2025.
AVEP BESS in context
Among the 156 storage plants in California in the EIA's inventory, it is the 25th largest, about 0.9% of the state's 13 GW of storage capacity.
Kern County has 268 power plants of 1 MW or more with 19 GW in all; AVEP BESS is 1% of that and the 2nd largest of 14 storage plants there.
The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Where it is
AVEP BESS (outlined) and other plants in Kern County, shaded. 34.878, -118.347.
Plant facts
- Operator
- Leeward Asset Management, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Kern County, CA
- EIA plant ID
- 65591
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| AVEPB | Batteries | 126 MW · 504 MWh | 2025 | – |
Nearby
Other plants in Kern County
Questions
AVEP BESS, answered
How much can AVEP BESS store and deliver?
AVEP BESS can deliver up to 126 MW and hold 504 MWh of energy, from one battery or storage system. Its net energy in 2025 was -17.2 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is AVEP BESS?
AVEP BESS is in Kern County, California, at about 34.878°, -118.347°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Who operates AVEP BESS?
It is operated by Leeward Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did AVEP BESS open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.