Storage power plant · San Bernardino, CA
Daggett 1
Daggett 1 is a 114 MW storage power plant in San Bernardino County, California, operated by Daggett Solar Power 1 LLC. Its oldest generator still running came online in 2025.
Daggett 1 in context
Among the 156 storage plants in California in the EIA's inventory, it is the 30th largest, about 0.8% of the state's 13 GW of storage capacity.
San Bernardino County has 129 power plants of 1 MW or more with 7.1 GW in all; Daggett 1 is 2% of that and the 2nd largest of 6 storage plants there.
The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Where it is
Daggett 1 (outlined) and other plants in San Bernardino County, shaded. 34.861, -116.855.
Plant facts
- Operator
- Daggett Solar Power 1 LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- San Bernardino County, CA
- EIA plant ID
- 67931
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| DAG1 | Batteries | 114 MW · 454 MWh | 2025 | – |
Questions
Daggett 1, answered
How much can Daggett 1 store and deliver?
Daggett 1 can deliver up to 114 MW and hold 454 MWh of energy, from one battery or storage system. Its net energy in 2025 was -6.4 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Daggett 1?
Daggett 1 is in San Bernardino County, California, at about 34.861°, -116.855°. It is one of 129 power plants of 1 MW or more in the county. The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Who operates Daggett 1?
It is operated by Daggett Solar Power 1 LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Daggett 1 open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.