Pinyon Pine II
Pinyon Pine II is a 132 MW wind power plant in Kern County, California, operated by Pinyon Pines Wind II, LLC. Its oldest generator still running came online in 2012. In 2025 it generated 204 GWh, about what 34,000 average California homes use in a year.
Pinyon Pine II in context
Among the 112 wind plants in California in the EIA's inventory, it is the 20th largest, about 2.0% of the state's 6.6 GW of wind capacity.
Kern County has 268 power plants of 1 MW or more with 19 GW in all; Pinyon Pine II is 1% of that and the 13th largest of 49 wind plants there.
Its capacity factor of 18% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pinyon Pine II (outlined) and other plants in Kern County, shaded. 35.027, -118.223.
Plant facts
- Operator
- Pinyon Pines Wind II, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Kern County, CA
- EIA plant ID
- 57837
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| AW09 | Onshore Wind Turbine | 132 MW | 2012 | – |
Nearby
Other plants in Kern County
Questions
Pinyon Pine II, answered
How much power does Pinyon Pine II produce?
Pinyon Pine II has 132 MW of capacity from one generator. In 2025 it generated 204 GWh, 18% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pinyon Pine II power?
Its 2025 output of 204 GWh equals the yearly electricity use of about 34,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pinyon Pine II?
Pinyon Pine II is in Kern County, California, at about 35.027°, -118.223°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Who operates Pinyon Pine II?
It is operated by Pinyon Pines Wind II, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Pinyon Pine II open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.