Solar power plant · Imperial, CA

Heber Solar

Heber Solar is a 11 MW solar power plant in Imperial County, California, operated by Axium US Solar Holdings LLC. Its oldest generator still running came online in 2014. In 2025 it generated 24 GWh, about what 4,100 average California homes use in a year.

Capacity11 MWNameplate, September 2026
Generated24 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators1Oldest from 2014

Heber Solar in context

Among the 967 solar plants in California in the EIA's inventory, it is the 285th largest, about 0.0% of the state's 32 GW of solar capacity.

Imperial County has 73 power plants of 1 MW or more with 4.6 GW in all; Heber Solar is 0% of that and the 24th largest of 36 solar plants there.

Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010203020182019202020212022202320242025GWh 24
0102030201920212023202524

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Heber Solar (outlined) and other plants in Imperial County, shaded. 32.712, -115.541.

Plant facts

Operator
Axium US Solar Holdings LLC
Sector
IPP Non-CHP
Grid operator
IID
County
Imperial County, CA
EIA plant ID
58398
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 11 MW 2014 –

Questions

Heber Solar, answered

How much power does Heber Solar produce?

Heber Solar has 11 MW of capacity from one generator. In 2025 it generated 24 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does Heber Solar power?

Its 2025 output of 24 GWh equals the yearly electricity use of about 4,100 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Heber Solar?

Heber Solar is in Imperial County, California, at about 32.712°, -115.541°. It is one of 73 power plants of 1 MW or more in the county. The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Who operates Heber Solar?

It is operated by Axium US Solar Holdings LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority IID.

When did Heber Solar open?

Its oldest generator still running came online in 2014.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.