Solar power plant · Kern, CA

Rosamond South 1

Rosamond South 1 is a 257 MW solar power plant in Kern County, California, operated by Golden Fields Solar IV, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 157 GWh, about what 27,000 average California homes use in a year.

Capacity257 MWNameplate, September 2026
Generated157 GWhIn 2025
Capacity factor–Not a full year of data
Generators2Oldest from 2025

Rosamond South 1 in context

Among the 967 solar plants in California in the EIA's inventory, it is the 33rd largest, about 0.8% of the state's 32 GW of solar capacity.

Kern County has 268 power plants of 1 MW or more with 19 GW in all; Rosamond South 1 is 1% of that and the 12th largest of 158 solar plants there.

The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Rosamond South 1 (outlined) and other plants in Kern County, shaded. 34.842, -118.379.

Plant facts

Operator
Golden Fields Solar IV, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Kern County, CA
EIA plant ID
67764
  • Solar140 MW54%
  • Storage117 MW46%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
RS1 Solar Photovoltaic 140 MW 2025 –
RBESS Batteries 117 MW · 472 MWh 2025 –

Questions

Rosamond South 1, answered

How much power does Rosamond South 1 produce?

Rosamond South 1 has 257 MW of capacity from 2 generators. In 2025 it generated 157 GWh.

How many homes does Rosamond South 1 power?

Its 2025 output of 157 GWh equals the yearly electricity use of about 27,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Rosamond South 1?

Rosamond South 1 is in Kern County, California, at about 34.842°, -118.379°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Who operates Rosamond South 1?

It is operated by Golden Fields Solar IV, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Rosamond South 1 open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.