Solar power plant · Sacramento, CA
Rancho Seco Solar, LLC
Rancho Seco Solar, LLC is a 11 MW solar power plant in Sacramento County, California, operated by Rancho Seco Solar, LLC. Its oldest generator still running came online in 2016. In 2025 it generated 18 GWh, about what 3,000 average California homes use in a year.
Rancho Seco Solar, LLC in context
Among the 967 solar plants in California in the EIA's inventory, it is the 286th largest, about 0.0% of the state's 32 GW of solar capacity.
Sacramento County has 63 power plants of 1 MW or more with 1.8 GW in all; Rancho Seco Solar, LLC is 1% of that and the 5th largest of 53 solar plants there.
Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Sacramento County goes 3.9 hours a year without power, the 46th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Rancho Seco Solar, LLC (outlined) and other plants in Sacramento County, shaded. 38.340, -121.115.
Plant facts
- Operator
- Rancho Seco Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- BANC
- County
- Sacramento County, CA
- EIA plant ID
- 60226
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN01 | Solar Photovoltaic | 11 MW | 2016 | – |
Questions
Rancho Seco Solar, LLC, answered
How much power does Rancho Seco Solar, LLC produce?
Rancho Seco Solar, LLC has 11 MW of capacity from one generator. In 2025 it generated 18 GWh, 19% of the most it could have made running flat out all year (its capacity factor).
How many homes does Rancho Seco Solar, LLC power?
Its 2025 output of 18 GWh equals the yearly electricity use of about 3,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Rancho Seco Solar, LLC?
Rancho Seco Solar, LLC is in Sacramento County, California, at about 38.340°, -121.115°. It is one of 63 power plants of 1 MW or more in the county. The average electricity customer in Sacramento County goes 3.9 hours a year without power, the 46th most of 56 counties in California. The county's page has the full outage record.
Who operates Rancho Seco Solar, LLC?
It is operated by Rancho Seco Solar, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority BANC.
When did Rancho Seco Solar, LLC open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.