Natural gas power plant · Santa Clara, CA

SJ/SC WPCP

SJ/SC WPCP is a 14 MW natural gas power plant in Santa Clara County, California, operated by San Jose/Santa Clara Water P C. Its oldest generator still running came online in 2020. In 2025 it generated 83 GWh, about what 14,000 average California homes use in a year.

Capacity14 MWNameplate, September 2026
Generated83 GWhIn 2025
Capacity factor68%Share of the most it could make, 2025
Generators4Oldest from 2020

SJ/SC WPCP in context

Among the 304 natural gas plants in California in the EIA's inventory, it is the 177th largest, about 0.0% of the state's 41 GW of natural gas capacity.

Santa Clara County has 53 power plants of 1 MW or more with 1.9 GW in all; SJ/SC WPCP is 1% of that and the 8th largest of 30 natural gas plants there.

Its capacity factor of 68% in 2025 is higher than the 23% typical for natural gas plants across the US.

The average electricity customer in Santa Clara County goes 4.7 hours a year without power, the 38th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608010020182019202020212022202320242025GWh 83
020406080100201920212023202583

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

SJ/SC WPCP (outlined) and other plants in Santa Clara County, shaded. 37.434, -121.946.

Plant facts

Operator
San Jose/Santa Clara Water P C
Sector
Commercial CHP
Grid operator
CISO
County
Santa Clara County, CA
EIA plant ID
56080
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
EG4 Natural Gas Internal Combustion Engine 3.5 MW 2020 –
EG5 Natural Gas Internal Combustion Engine 3.5 MW 2020 –
EG6 Natural Gas Internal Combustion Engine 3.5 MW 2020 –
EG7 Natural Gas Internal Combustion Engine 3.5 MW 2020 –

Retired

GeneratorTechnologyCapacityOnlineRetired
E6Other Waste Biomass1.8 MW19632008
E1Other Waste Biomass0.8 MW19532008
E3Other Waste Biomass0.8 MW19532015
E2Other Waste Biomass0.8 MW19532017
E5Other Waste Biomass1.8 MW19632017
EG3Natural Gas Internal Combustion Engine2.8 MW19852021
EG1Natural Gas Internal Combustion Engine2.8 MW19952021
EG2Natural Gas Internal Combustion Engine2.8 MW19852021

Questions

SJ/SC WPCP, answered

How much power does SJ/SC WPCP produce?

SJ/SC WPCP has 14 MW of capacity from 4 generators. In 2025 it generated 83 GWh, 68% of the most it could have made running flat out all year (its capacity factor).

How many homes does SJ/SC WPCP power?

Its 2025 output of 83 GWh equals the yearly electricity use of about 14,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is SJ/SC WPCP?

SJ/SC WPCP is in Santa Clara County, California, at about 37.434°, -121.946°. It is one of 53 power plants of 1 MW or more in the county. The average electricity customer in Santa Clara County goes 4.7 hours a year without power, the 38th most of 56 counties in California. The county's page has the full outage record.

Who operates SJ/SC WPCP?

It is operated by San Jose/Santa Clara Water P C (EIA sector: Commercial CHP), and it feeds the California ISO.

When did SJ/SC WPCP open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.