Biomass power plant · Amador, CA
Buena Vista Biomass Power
Buena Vista Biomass Power is a 23 MW biomass power plant in Amador County, California, operated by Buena Vista Biomass LLC. Its oldest generator still running came online in 2012.
Buena Vista Biomass Power in context
Among the 157 other-fuel plants in California in the EIA's inventory, it is the 55th largest, about 0.5% of the state's 4.9 GW of other-fuel capacity.
Amador County has 6 power plants of 1 MW or more with 234 MW in all; Buena Vista Biomass Power is 10% of that.
The average electricity customer in Amador County goes 52 hours a year without power, the 7th most of 56 counties in California. The county's page has the full outage record.
Where it is
Buena Vista Biomass Power (outlined) and other plants in Amador County, shaded. 38.278, -120.914.
Plant facts
- Operator
- Buena Vista Biomass LLC
- Sector
- Commercial Non-CHP
- Grid operator
- CISO
- County
- Amador County, CA
- EIA plant ID
- 58472
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Wood/Wood Waste Biomass | 23 MW | 2012 | – |
Nearby
Other plants in Amador County
Questions
Buena Vista Biomass Power, answered
How much power does Buena Vista Biomass Power produce?
Buena Vista Biomass Power has 23 MW of capacity from one generator. No full year of generation is reported yet.
Where is Buena Vista Biomass Power?
Buena Vista Biomass Power is in Amador County, California, at about 38.278°, -120.914°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Amador County goes 52 hours a year without power, the 7th most of 56 counties in California. The county's page has the full outage record.
Who operates Buena Vista Biomass Power?
It is operated by Buena Vista Biomass LLC (EIA sector: Commercial Non-CHP), and it feeds the California ISO.
When did Buena Vista Biomass Power open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.