Biomass power plant · Humboldt, CA
Fairhaven Power
Fairhaven Power is a 19 MW biomass power plant in Humboldt County, California, operated by DG Fairhaven Power LLC. Its oldest generator still running came online in 1986.
Fairhaven Power in context
Among the 157 other-fuel plants in California in the EIA's inventory, it is the 62nd largest, about 0.4% of the state's 4.9 GW of other-fuel capacity.
Humboldt County has 7 power plants of 1 MW or more with 234 MW in all; Fairhaven Power is 8% of that and the 2nd largest of 2 biomass plants there.
The average electricity customer in Humboldt County goes 30 hours a year without power, the 13th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Where it is
Fairhaven Power (outlined) and other plants in Humboldt County, shaded. 40.800, -124.203.
Plant facts
- Operator
- DG Fairhaven Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Humboldt County, CA
- EIA plant ID
- 10052
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Wood/Wood Waste Biomass | 19 MW | 1986 | – |
Nearby
Other plants in Humboldt County
Questions
Fairhaven Power, answered
How much power does Fairhaven Power produce?
Fairhaven Power has 19 MW of capacity from one generator. No full year of generation is reported yet.
Where is Fairhaven Power?
Fairhaven Power is in Humboldt County, California, at about 40.800°, -124.203°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Humboldt County goes 30 hours a year without power, the 13th most of 56 counties in California. The county's page has the full outage record.
Who operates Fairhaven Power?
It is operated by DG Fairhaven Power LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Fairhaven Power open?
Its oldest generator still running came online in 1986.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Methodology.