Storage power plant · Kings, CA
Cherry
Cherry is a 40 MW storage power plant in Kings County, California, operated by Westlands Cherry, LLC. Its oldest generator still running came online in 2026.
Cherry in context
Among the 156 storage plants in California in the EIA's inventory, it is the 74th largest, about 0.3% of the state's 13 GW of storage capacity.
Kings County has 52 power plants of 1 MW or more with 2.8 GW in all; Cherry is 1% of that and the 3rd largest of 5 storage plants there.
The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Where it is
Cherry (outlined) and other plants in Kings County, shaded. 36.122, -119.923.
Plant facts
- Operator
- Westlands Cherry, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Kings County, CA
- EIA plant ID
- 63850
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BESS1 | Batteries | 40 MW · 160 MWh | 2026 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| BESS2 | Batteries | 110 MW | 2027 |
| CHERY | Solar Photovoltaic | 250 MW | 2027 |
Questions
Cherry, answered
How much can Cherry store and deliver?
Cherry can deliver up to 40 MW and hold 160 MWh of energy, from one battery or storage system.
Where is Cherry?
Cherry is in Kings County, California, at about 36.122°, -119.923°. It is one of 52 power plants of 1 MW or more in the county. The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Who operates Cherry?
It is operated by Westlands Cherry, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Cherry open?
Its oldest generator still running came online in 2026. 2 more generators are planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.