Storage power plant · San Diego, CA
Valley Center 85
Valley Center 85 is a 85 MW storage power plant in San Diego County, California, operated by Terra-Gen Operating Co-BESS 2. Its oldest generator still running came online in 2021.
Valley Center 85 in context
Among the 156 storage plants in California in the EIA's inventory, it is the 46th largest, about 0.6% of the state's 13 GW of storage capacity.
San Diego County has 107 power plants of 1 MW or more with 5.1 GW in all; Valley Center 85 is 2% of that and the 6th largest of 33 storage plants there.
The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Valley Center 85 (outlined) and other plants in San Diego County, shaded. 33.227, -117.018.
Plant facts
- Operator
- Terra-Gen Operating Co-BESS 2
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- San Diego County, CA
- EIA plant ID
- 66500
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| VC85 | Batteries | 85 MW · 212 MWh | 2021 | – |
Questions
Valley Center 85, answered
How much can Valley Center 85 store and deliver?
Valley Center 85 can deliver up to 85 MW and hold 212 MWh of energy, from one battery or storage system. Its net energy in 2025 was -13.8 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Valley Center 85?
Valley Center 85 is in San Diego County, California, at about 33.227°, -117.018°. It is one of 107 power plants of 1 MW or more in the county. The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.
Who operates Valley Center 85?
It is operated by Terra-Gen Operating Co-BESS 2 (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Valley Center 85 open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Methodology.