VESI Pomona is a 40 MW storage power plant in Los Angeles County, California, operated by VESI Pomona Energy Storage, Inc.. Its oldest generator still running came online in 2016.

Capacity40 MWNameplate, September 2026
Net energy-4.2 GWhIn 2025
Capacity factor–Not a full year of data
Generators2Oldest from 2016

VESI Pomona in context

Among the 156 storage plants in California in the EIA's inventory, it is the 71st largest, about 0.3% of the state's 13 GW of storage capacity.

Los Angeles County has 254 power plants of 1 MW or more with 14 GW in all; VESI Pomona is 0% of that and the 9th largest of 17 storage plants there.

The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.

000111120182019202020212022202320242025GWh -4
00011112019202120232025-4

Where it is

VESI Pomona (outlined) and other plants in Los Angeles County, shaded. 34.059, -117.774.

Plant facts

Operator
VESI Pomona Energy Storage, Inc.
Sector
IPP Non-CHP
Grid operator
CISO
County
Los Angeles County, CA
EIA plant ID
50300
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BESS1 Batteries 20 MW · 20 MWh 2016 –
BESS2 Batteries 20 MW · 20 MWh 2023 –

Retired

GeneratorTechnologyCapacityOnlineRetired
GEN1Natural Gas Fired Combustion Turbine46 MW19852019

Questions

VESI Pomona, answered

How much can VESI Pomona store and deliver?

VESI Pomona can deliver up to 40 MW and hold 40 MWh of energy, from 2 storage units. Its net energy in 2025 was -4.2 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is VESI Pomona?

VESI Pomona is in Los Angeles County, California, at about 34.059°, -117.774°. It is one of 254 power plants of 1 MW or more in the county. The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.

Who operates VESI Pomona?

It is operated by VESI Pomona Energy Storage, Inc. (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did VESI Pomona open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Methodology.