Solar power plant · Riverside, CA
Blythe Solar IV, LLC
Blythe Solar IV, LLC is a 184 MW solar power plant in Riverside County, California, operated by Blythe Solar IV, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 347 GWh, about what 59,000 average California homes use in a year.
Blythe Solar IV, LLC in context
Among the 967 solar plants in California in the EIA's inventory, it is the 59th largest, about 0.6% of the state's 32 GW of solar capacity.
Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Blythe Solar IV, LLC is 2% of that and the 17th largest of 70 solar plants there.
Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Blythe Solar IV, LLC (outlined) and other plants in Riverside County, shaded. 33.682, -114.768.
Plant facts
- Operator
- Blythe Solar IV, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Riverside County, CA
- EIA plant ID
- 60095
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BLS4A | Solar Photovoltaic | 69 MW | 2020 | – |
| BLS4B | Solar Photovoltaic | 69 MW | 2020 | – |
| BLST4 | Batteries | 47 MW · 47 MWh | 2022 | – |
Questions
Blythe Solar IV, LLC, answered
How much power does Blythe Solar IV, LLC produce?
Blythe Solar IV, LLC has 184 MW of capacity from 3 generators. In 2025 it generated 347 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Blythe Solar IV, LLC power?
Its 2025 output of 347 GWh equals the yearly electricity use of about 59,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Blythe Solar IV, LLC?
Blythe Solar IV, LLC is in Riverside County, California, at about 33.682°, -114.768°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Who operates Blythe Solar IV, LLC?
It is operated by Blythe Solar IV, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Blythe Solar IV, LLC open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.