Solar power plant · Kings, CA
Sun City Project LLC
Sun City Project LLC is a 20 MW solar power plant in Kings County, California, operated by Avenal Solar Holdings LLC. Its oldest generator still running came online in 2011. In 2025 it generated 33 GWh, about what 5,600 average California homes use in a year.
Sun City Project LLC in context
Among the 967 solar plants in California in the EIA's inventory, it is the 167th largest, about 0.1% of the state's 32 GW of solar capacity.
Kings County has 52 power plants of 1 MW or more with 2.8 GW in all; Sun City Project LLC is 1% of that and the 9th largest of 41 solar plants there.
Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Sun City Project LLC (outlined) and other plants in Kings County, shaded. 35.983, -120.110.
Plant facts
- Operator
- Avenal Solar Holdings LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Kings County, CA
- EIA plant ID
- 57360
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 20 MW | 2011 | – |
Questions
Sun City Project LLC, answered
How much power does Sun City Project LLC produce?
Sun City Project LLC has 20 MW of capacity from one generator. In 2025 it generated 33 GWh, 19% of the most it could have made running flat out all year (its capacity factor).
How many homes does Sun City Project LLC power?
Its 2025 output of 33 GWh equals the yearly electricity use of about 5,600 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sun City Project LLC?
Sun City Project LLC is in Kings County, California, at about 35.983°, -120.110°. It is one of 52 power plants of 1 MW or more in the county. The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Who operates Sun City Project LLC?
It is operated by Avenal Solar Holdings LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Sun City Project LLC open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.