Solar power plant · Riverside, CA

Blythe Solar II, LLC

Blythe Solar II, LLC is a 246 MW solar power plant in Riverside County, California, operated by Blythe Solar II, LLC. Its oldest generator still running came online in 2016. In 2025 it generated 337 GWh, about what 57,000 average California homes use in a year.

Capacity246 MWNameplate, September 2026
Generated337 GWhIn 2025
Capacity factor16%Share of the most it could make, 2025
Generators5Oldest from 2016

Blythe Solar II, LLC in context

Among the 967 solar plants in California in the EIA's inventory, it is the 44th largest, about 0.8% of the state's 32 GW of solar capacity.

Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Blythe Solar II, LLC is 2% of that and the 14th largest of 70 solar plants there.

Its capacity factor of 16% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020182019202020212022202320242025GWh 337
01002003004002019202120232025337

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Blythe Solar II, LLC (outlined) and other plants in Riverside County, shaded. 33.680, -114.730.

Plant facts

Operator
Blythe Solar II, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Riverside County, CA
EIA plant ID
60092
  • Solar131 MW53%
  • Storage115 MW47%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BLST2 Batteries 115 MW · 539 MWh 2021 –
BLCK5 Solar Photovoltaic 34 MW 2016 –
BLCK4 Solar Photovoltaic 33 MW 2016 –
BLCK7 Solar Photovoltaic 32 MW 2016 –
BLCK6 Solar Photovoltaic 32 MW 2016 –

Questions

Blythe Solar II, LLC, answered

How much power does Blythe Solar II, LLC produce?

Blythe Solar II, LLC has 246 MW of capacity from 5 generators. In 2025 it generated 337 GWh, 16% of the most it could have made running flat out all year (its capacity factor).

How many homes does Blythe Solar II, LLC power?

Its 2025 output of 337 GWh equals the yearly electricity use of about 57,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Blythe Solar II, LLC?

Blythe Solar II, LLC is in Riverside County, California, at about 33.680°, -114.730°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Who operates Blythe Solar II, LLC?

It is operated by Blythe Solar II, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Blythe Solar II, LLC open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.