Solar power plant · Riverside, CA

Blythe Solar 110, LLC

Blythe Solar 110, LLC is a 173 MW solar power plant in Riverside County, California, operated by Blythe Solar 110, LLC. Its oldest generator still running came online in 2016. In 2025 it generated 284 GWh, about what 48,000 average California homes use in a year.

Capacity173 MWNameplate, September 2026
Generated284 GWhIn 2025
Capacity factor19%Share of the most it could make, 2025
Generators4Oldest from 2016

Blythe Solar 110, LLC in context

Among the 967 solar plants in California in the EIA's inventory, it is the 62nd largest, about 0.5% of the state's 32 GW of solar capacity.

Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Blythe Solar 110, LLC is 2% of that and the 18th largest of 70 solar plants there.

Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 284
02004006008002019202120232025284

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Blythe Solar 110, LLC (outlined) and other plants in Riverside County, shaded. 33.680, -114.742.

Plant facts

Operator
Blythe Solar 110, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Riverside County, CA
EIA plant ID
60093
  • Solar110 MW64%
  • Storage63 MW36%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BES1 Batteries 63 MW · 301 MWh 2021 –
BLCK1 Solar Photovoltaic 39 MW 2016 –
BLCK2 Solar Photovoltaic 36 MW 2016 –
BLCK3 Solar Photovoltaic 35 MW 2016 –

Questions

Blythe Solar 110, LLC, answered

How much power does Blythe Solar 110, LLC produce?

Blythe Solar 110, LLC has 173 MW of capacity from 4 generators. In 2025 it generated 284 GWh, 19% of the most it could have made running flat out all year (its capacity factor).

How many homes does Blythe Solar 110, LLC power?

Its 2025 output of 284 GWh equals the yearly electricity use of about 48,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Blythe Solar 110, LLC?

Blythe Solar 110, LLC is in Riverside County, California, at about 33.680°, -114.742°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Who operates Blythe Solar 110, LLC?

It is operated by Blythe Solar 110, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Blythe Solar 110, LLC open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.