Solar power plant · Kern, CA
Sandrini Solar 100
Sandrini Solar 100 is a 195 MW solar power plant in Kern County, California, operated by EDPR CA Solar Park II LLC. Its oldest generator still running came online in 2024. In 2025 it generated 236 GWh, about what 40,000 average California homes use in a year.
Sandrini Solar 100 in context
Among the 967 solar plants in California in the EIA's inventory, it is the 57th largest, about 0.6% of the state's 32 GW of solar capacity.
Kern County has 268 power plants of 1 MW or more with 19 GW in all; Sandrini Solar 100 is 1% of that and the 16th largest of 158 solar plants there.
The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Sandrini Solar 100 (outlined) and other plants in Kern County, shaded. 35.113, -119.111.
Plant facts
- Operator
- EDPR CA Solar Park II LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Kern County, CA
- EIA plant ID
- 65664
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN02 | Solar Photovoltaic | 100 MW | 2024 | – |
| GENBA | Batteries | 95 MW · 368 MWh | 2025 | – |
Nearby
Other plants in Kern County
Questions
Sandrini Solar 100, answered
How much power does Sandrini Solar 100 produce?
Sandrini Solar 100 has 195 MW of capacity from 2 generators. In 2025 it generated 236 GWh.
How many homes does Sandrini Solar 100 power?
Its 2025 output of 236 GWh equals the yearly electricity use of about 40,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sandrini Solar 100?
Sandrini Solar 100 is in Kern County, California, at about 35.113°, -119.111°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Who operates Sandrini Solar 100?
It is operated by EDPR CA Solar Park II LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Sandrini Solar 100 open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.