Solar power plant · Riverside, CA
Blythe Mesa Solar II
Blythe Mesa Solar II is a 336 MW solar power plant in Riverside County, California, operated by IPX Power USA, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 586 GWh, about what 99,000 average California homes use in a year.
Blythe Mesa Solar II in context
Among the 967 solar plants in California in the EIA's inventory, it is the 18th largest, about 1.1% of the state's 32 GW of solar capacity.
Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Blythe Mesa Solar II is 3% of that and the 7th largest of 70 solar plants there.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Blythe Mesa Solar II (outlined) and other plants in Riverside County, shaded. 33.641, -114.680.
Plant facts
- Operator
- IPX Power USA, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Riverside County, CA
- EIA plant ID
- 65053
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| IPBMS | Solar Photovoltaic | 224 MW | 2022 | – |
| BMSES | Batteries | 112 MW · 448 MWh | 2022 | – |
Questions
Blythe Mesa Solar II, answered
How much power does Blythe Mesa Solar II produce?
Blythe Mesa Solar II has 336 MW of capacity from 2 generators. In 2025 it generated 586 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Blythe Mesa Solar II power?
Its 2025 output of 586 GWh equals the yearly electricity use of about 99,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Blythe Mesa Solar II?
Blythe Mesa Solar II is in Riverside County, California, at about 33.641°, -114.680°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Who operates Blythe Mesa Solar II?
It is operated by IPX Power USA, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Blythe Mesa Solar II open?
Its oldest generator still running came online in 2022.