Solar power plant · Riverside, CA

Blythe Mesa Solar II

Blythe Mesa Solar II is a 336 MW solar power plant in Riverside County, California, operated by IPX Power USA, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 586 GWh, about what 99,000 average California homes use in a year.

Capacity336 MWNameplate, September 2026
Generated586 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators2Oldest from 2022

Blythe Mesa Solar II in context

Among the 967 solar plants in California in the EIA's inventory, it is the 18th largest, about 1.1% of the state's 32 GW of solar capacity.

Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Blythe Mesa Solar II is 3% of that and the 7th largest of 70 solar plants there.

Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008002022202320242025GWh 586
02004006008002022202320242025586

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Blythe Mesa Solar II (outlined) and other plants in Riverside County, shaded. 33.641, -114.680.

Plant facts

Operator
IPX Power USA, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Riverside County, CA
EIA plant ID
65053
  • Solar224 MW67%
  • Storage112 MW33%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
IPBMS Solar Photovoltaic 224 MW 2022 –
BMSES Batteries 112 MW · 448 MWh 2022 –

Questions

Blythe Mesa Solar II, answered

How much power does Blythe Mesa Solar II produce?

Blythe Mesa Solar II has 336 MW of capacity from 2 generators. In 2025 it generated 586 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Blythe Mesa Solar II power?

Its 2025 output of 586 GWh equals the yearly electricity use of about 99,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Blythe Mesa Solar II?

Blythe Mesa Solar II is in Riverside County, California, at about 33.641°, -114.680°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Who operates Blythe Mesa Solar II?

It is operated by IPX Power USA, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Blythe Mesa Solar II open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.