Natural gas power plant · San Bernardino, CA

Grapeland Hybrid

Grapeland Hybrid is a 60 MW natural gas power plant in San Bernardino County, California, operated by Southern California Edison Co. Its oldest generator still running came online in 2007. In 2025 it generated 2.2 GWh, about what 371 average California homes use in a year.

Capacity60 MWNameplate, September 2026
Generated2.2 GWhIn 2025
Capacity factor0%Share of the most it could make, 2025
Generators2Oldest from 2007

Grapeland Hybrid in context

Among the 304 natural gas plants in California in the EIA's inventory, it is the 99th largest, about 0.1% of the state's 41 GW of natural gas capacity.

San Bernardino County has 129 power plants of 1 MW or more with 7.1 GW in all; Grapeland Hybrid is 1% of that and the 4th largest of 18 natural gas plants there.

Its capacity factor of 0% in 2025 is lower than the 23% typical for natural gas plants across the US.

The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

051015202520182019202020212022202320242025GWh 2
051015202520192021202320252

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Grapeland Hybrid (outlined) and other plants in San Bernardino County, shaded. 34.090, -117.534.

Plant facts

Operator
Southern California Edison Co
Sector
Electric Utility
Grid operator
CISO
County
San Bernardino County, CA
EIA plant ID
56472
  • Natural gas50 MW83%
  • Storage10 MW17%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Natural Gas Fired Combustion Turbine 50 MW 2007 –
BA1 Batteries 10 MW · 10 MWh 2016 –

Questions

Grapeland Hybrid, answered

How much power does Grapeland Hybrid produce?

Grapeland Hybrid has 60 MW of capacity from 2 generators. In 2025 it generated 2.2 GWh, 0% of the most it could have made running flat out all year (its capacity factor).

How many homes does Grapeland Hybrid power?

Its 2025 output of 2.2 GWh equals the yearly electricity use of about 371 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Grapeland Hybrid?

Grapeland Hybrid is in San Bernardino County, California, at about 34.090°, -117.534°. It is one of 129 power plants of 1 MW or more in the county. The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.

Who operates Grapeland Hybrid?

It is operated by Southern California Edison Co (EIA sector: Electric Utility), and it feeds the California ISO.

When did Grapeland Hybrid open?

Its oldest generator still running came online in 2007.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.