Natural gas power plant · San Bernardino, CA
Grapeland Hybrid
Grapeland Hybrid is a 60 MW natural gas power plant in San Bernardino County, California, operated by Southern California Edison Co. Its oldest generator still running came online in 2007. In 2025 it generated 2.2 GWh, about what 371 average California homes use in a year.
Grapeland Hybrid in context
Among the 304 natural gas plants in California in the EIA's inventory, it is the 99th largest, about 0.1% of the state's 41 GW of natural gas capacity.
San Bernardino County has 129 power plants of 1 MW or more with 7.1 GW in all; Grapeland Hybrid is 1% of that and the 4th largest of 18 natural gas plants there.
Its capacity factor of 0% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Grapeland Hybrid (outlined) and other plants in San Bernardino County, shaded. 34.090, -117.534.
Plant facts
- Operator
- Southern California Edison Co
- Sector
- Electric Utility
- Grid operator
- CISO
- County
- San Bernardino County, CA
- EIA plant ID
- 56472
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | 50 MW | 2007 | – |
| BA1 | Batteries | 10 MW · 10 MWh | 2016 | – |
Questions
Grapeland Hybrid, answered
How much power does Grapeland Hybrid produce?
Grapeland Hybrid has 60 MW of capacity from 2 generators. In 2025 it generated 2.2 GWh, 0% of the most it could have made running flat out all year (its capacity factor).
How many homes does Grapeland Hybrid power?
Its 2025 output of 2.2 GWh equals the yearly electricity use of about 371 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Grapeland Hybrid?
Grapeland Hybrid is in San Bernardino County, California, at about 34.090°, -117.534°. It is one of 129 power plants of 1 MW or more in the county. The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Who operates Grapeland Hybrid?
It is operated by Southern California Edison Co (EIA sector: Electric Utility), and it feeds the California ISO.
When did Grapeland Hybrid open?
Its oldest generator still running came online in 2007.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.