Solar power plant · Fresno, CA
San Joaquin Solar
San Joaquin Solar is a 21 MW solar power plant in Fresno County, California, operated by GASNA 6P, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 22 GWh, about what 3,800 average California homes use in a year.
San Joaquin Solar in context
Among the 967 solar plants in California in the EIA's inventory, it is the 161st largest, about 0.1% of the state's 32 GW of solar capacity.
Fresno County has 105 power plants of 1 MW or more with 5.9 GW in all; San Joaquin Solar is 0% of that and the 12th largest of 73 solar plants there.
Its capacity factor of 12% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
San Joaquin Solar (outlined) and other plants in Fresno County, shaded. 36.527, -120.148.
Plant facts
- Operator
- GASNA 6P, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Fresno County, CA
- EIA plant ID
- 60678
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SJ1A | Solar Photovoltaic | 20 MW | 2018 | – |
| SJ1B | Solar Photovoltaic | 1.5 MW | 2019 | – |
Questions
San Joaquin Solar, answered
How much power does San Joaquin Solar produce?
San Joaquin Solar has 21 MW of capacity from 2 generators. In 2025 it generated 22 GWh, 12% of the most it could have made running flat out all year (its capacity factor).
How many homes does San Joaquin Solar power?
Its 2025 output of 22 GWh equals the yearly electricity use of about 3,800 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is San Joaquin Solar?
San Joaquin Solar is in Fresno County, California, at about 36.527°, -120.148°. It is one of 105 power plants of 1 MW or more in the county. The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Who operates San Joaquin Solar?
It is operated by GASNA 6P, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did San Joaquin Solar open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.