Solar power plant · Kern, CA
Beacon Solar Plant Site 2
Beacon Solar Plant Site 2 is a 47 MW solar power plant in Kern County, California, operated by Sune Beacon Site 2, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 112 GWh, about what 19,000 average California homes use in a year.
Beacon Solar Plant Site 2 in context
Among the 967 solar plants in California in the EIA's inventory, it is the 140th largest, about 0.1% of the state's 32 GW of solar capacity.
Kern County has 268 power plants of 1 MW or more with 19 GW in all; Beacon Solar Plant Site 2 is 0% of that and the 43rd largest of 158 solar plants there.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Beacon Solar Plant Site 2 (outlined) and other plants in Kern County, shaded. 35.266, -117.999.
Plant facts
- Operator
- Sune Beacon Site 2, LLC
- Sector
- IPP Non-CHP
- Grid operator
- LDWP
- County
- Kern County, CA
- EIA plant ID
- 59309
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BEAC2 | Solar Photovoltaic | 47 MW | 2017 | – |
Nearby
Other plants in Kern County
Questions
Beacon Solar Plant Site 2, answered
How much power does Beacon Solar Plant Site 2 produce?
Beacon Solar Plant Site 2 has 47 MW of capacity from one generator. In 2025 it generated 112 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Beacon Solar Plant Site 2 power?
Its 2025 output of 112 GWh equals the yearly electricity use of about 19,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Beacon Solar Plant Site 2?
Beacon Solar Plant Site 2 is in Kern County, California, at about 35.266°, -117.999°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Who operates Beacon Solar Plant Site 2?
It is operated by Sune Beacon Site 2, LLC (EIA sector: IPP Non-CHP), and it feeds the Los Angeles Department of Water and Power.
When did Beacon Solar Plant Site 2 open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.