Solar power plant · Maricopa, AZ

Arlington Valley Solar Energy I

Arlington Valley Solar Energy I is a 127 MW solar power plant in Maricopa County, Arizona, operated by RWE Americas, LLC. Its oldest generator still running came online in 2026.

Capacity127 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Arlington Valley Solar Energy I in context

Among the 109 solar plants in Arizona in the EIA's inventory, it is the 27th largest, about 1.3% of the state's 9.9 GW of solar capacity.

Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Arlington Valley Solar Energy I is 1% of that and the 15th largest of 40 solar plants there.

The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.

Where it is

Arlington Valley Solar Energy I (outlined) and other plants in Maricopa County, shaded. 33.322, -112.881.

Plant facts

Operator
RWE Americas, LLC
Sector
IPP Non-CHP
Grid operator
AZPS
County
Maricopa County, AZ
EIA plant ID
57679
Where Arizona's power comes from → Arizona power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
AVSE1 Solar Photovoltaic 127 MW 2026 –

Questions

Arlington Valley Solar Energy I, answered

How much power does Arlington Valley Solar Energy I produce?

Arlington Valley Solar Energy I has 127 MW of capacity from one generator. No full year of generation is reported yet.

Where is Arlington Valley Solar Energy I?

Arlington Valley Solar Energy I is in Maricopa County, Arizona, at about 33.322°, -112.881°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.

Who operates Arlington Valley Solar Energy I?

It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.

When did Arlington Valley Solar Energy I open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.