Ashtabula Wind II LLC is a 120 MW wind power plant in Steele County, North Dakota, operated by Ashtabula Wind II LLC. Its oldest generator still running came online in 2009. In 2025 it generated 364 GWh, about what 28,000 average North Dakota homes use in a year.

Capacity120 MWNameplate, September 2026
Generated364 GWhIn 2025
Capacity factor35%Share of the most it could make, 2025
Generators1Oldest from 2009

Ashtabula Wind II LLC in context

Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 19th largest, about 2.4% of the state's 5.0 GW of wind capacity.

Steele County has 2 power plants of 1 MW or more with 170 MW in all; Ashtabula Wind II LLC is 71% of that and the largest of 2 wind plants there.

Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 364
01002003004005002019202120232025364

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Ashtabula Wind II LLC (outlined) and other plants in Steele County, shaded. 47.292, -97.932.

Plant facts

Operator
Ashtabula Wind II LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Steele County, ND
EIA plant ID
57121
Where North Dakota's power comes from → North Dakota power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 120 MW 2009 –

Nearby

Other plants in Steele County

Questions

Ashtabula Wind II LLC, answered

How much power does Ashtabula Wind II LLC produce?

Ashtabula Wind II LLC has 120 MW of capacity from one generator. In 2025 it generated 364 GWh, 35% of the most it could have made running flat out all year (its capacity factor).

How many homes does Ashtabula Wind II LLC power?

Its 2025 output of 364 GWh equals the yearly electricity use of about 28,000 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Ashtabula Wind II LLC?

Ashtabula Wind II LLC is in Steele County, North Dakota, at about 47.292°, -97.932°. It is one of 2 power plants of 1 MW or more in the county.

Who operates Ashtabula Wind II LLC?

It is operated by Ashtabula Wind II LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Ashtabula Wind II LLC open?

Its oldest generator still running came online in 2009.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.