Where the power comes from · 2025
North Dakota
Coal made 53% of the electricity generated in North Dakota in 2025, the 5th highest coal share of any state. In 2005, coal made 95% of it; in 2025, 53%.
The mix
North Dakota's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
North Dakota's power plants
62 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in North Dakota, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
North Dakota's power plants emitted 647 kg of CO₂ for each MWh they generated in 2024, against 1,038 kg in 2005: the 46th lowest of 51. 28 million metric tons in all.
North Dakota among the states
- Generation42.9 TWh35th
- Renewable share41%16th
- Carbon-free share41%29th
- Cleanest electricity (kg CO₂/MWh, 2024)64746th
- Coal share53%5th
- Wind share36%6th
- Natural gas share6.5%45th
- Hydro share4.7%16th
More on North Dakota
Power outage history → Rooftop solar and home batteries → Average electric bills →Plants
The largest plants in North Dakota
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| Coal Creek | Coal | McLean | 1.2 GW | 8.2 TWh | 77% | 1979 |
| Antelope Valley | Coal | Mercer | 954 MW | 6.0 TWh | 72% | 1984 |
| Pioneer Generation Station | Natural gas | Williams | 897 MW | 1.7 TWh | – | 2013 |
| Milton R Young | Coal | Oliver | 734 MW | 3.7 TWh | 58% | 1970 |
| Leland Olds | Coal | Mercer | 656 MW | 2.4 TWh | 41% | 1966 |
| Garrison | Hydro | Mercer | 583 MW | 2.0 TWh | 39% | 1956 |
| Coyote | Coal | Mercer | 450 MW | 2.1 TWh | 54% | 1981 |
| Lonesome Creek Station | Natural gas | McKenzie | 363 MW | 842 GWh | 27% | 2013 |
| Aurora Wind Project | Wind | Williams | 299 MW | 913 GWh | 35% | 2021 |
| Badger Wind, LLC | Wind | McIntosh | 250 MW | – | – | 2026 |
| Bison 4 Wind Energy Center | Wind | Morton | 205 MW | 573 GWh | 32% | 2015 |
| Courtenay Wind Farm | Wind | Stutsman | 200 MW | 423 GWh | 24% | 2016 |
| Emmons-Logan Wind, LLC | Wind | Emmons | 200 MW | 877 GWh | 50% | 2019 |
| Bowman Wind | Wind | Bowman | 200 MW | 118 GWh | – | 2025 |
| Burke Wind, LLC | Wind | Burke | 199 MW | 782 GWh | 45% | 2020 |
| Oliver Wind IV | Wind | Oliver | 199 MW | 800 GWh | 46% | 2024 |
| Tatanka Wind Power LLC | Wind | Dickey | 180 MW | 476 GWh | 30% | 2008 |
| R M Heskett | Natural gas | Morton | 178 MW | 56 GWh | 4% | 2014 |
| Thunder Spirit Wind, LLC | Wind | Adams | 156 MW | 568 GWh | 42% | 2015 |
| Merricourt Wind Energy Center | Wind | McIntosh | 150 MW | 584 GWh | 44% | 2020 |
| Border Winds Wind Farm | Wind | Rolette | 150 MW | 345 GWh | 26% | 2015 |
| Lindahl Wind Project, LLC | Wind | Williams | 150 MW | 485 GWh | 37% | 2017 |
| Brady II Wind Energy Center | Wind | Stark | 150 MW | 641 GWh | 49% | 2016 |
| Brady Wind Energy Center | Wind | Stark | 150 MW | 639 GWh | 49% | 2016 |
| Foxtail Wind, LLC | Wind | Dickey | 150 MW | 623 GWh | 47% | 2020 |
| Rugby Wind Power Project | Wind | Pierce | 149 MW | 348 GWh | 27% | 2009 |
| FPL Energy Ashtabula Wind LLC | Wind | Barnes | 149 MW | 583 GWh | 45% | 2008 |
| Ashtabula Wind II LLC | Wind | Steele | 120 MW | 364 GWh | 35% | 2009 |
| Langdon Renewables, LLC | Wind | Cavalier | 119 MW | 489 GWh | 47% | 2007 |
| Prairie Winds ND1 | Wind | Ward | 116 MW | 354 GWh | 35% | 2009 |
| Glen Ullin Energy Center | Wind | Morton | 107 MW | 439 GWh | 47% | 2019 |
| Spiritwood Station | Natural gas | Stutsman | 106 MW | 186 GWh | 20% | 2014 |
| Bison 2 Wind Energy Center | Wind | Morton | 105 MW | 270 GWh | 29% | 2012 |
| Bison 3 Wind Energy Center | Wind | Morton | 105 MW | 268 GWh | 29% | 2012 |
| Sunflower Wind Project | Wind | Morton | 104 MW | 432 GWh | 47% | 2016 |
| Baldwin Wind LLC | Wind | Burleigh | 102 MW | 384 GWh | 43% | 2010 |
| New Frontier Wind | Wind | McHenry | 100 MW | 387 GWh | 44% | 2018 |
| Oliver Wind III, LLC | Wind | Morton | 99 MW | 380 GWh | 44% | 2017 |
| Bison I Wind Energy Center | Wind | Morton | 82 MW | 197 GWh | 27% | 2010 |
| Ashtabula Wind III LLC | Wind | Barnes | 62 MW | 120 GWh | 22% | 2010 |
| FPL Energy North Dakota Wind I/II | Wind | LaMoure | 62 MW | 121 GWh | 22% | 2003 |
| FPL Energy Oliver Wind I LLC | Wind | Oliver | 51 MW | 182 GWh | 41% | 2006 |
| FPL Energy Burleigh County Wind | Wind | Burleigh | 50 MW | 186 GWh | 43% | 2005 |
| Luverne Wind Energy Center | Wind | Steele | 50 MW | 151 GWh | 35% | 2009 |
| Wilton Wind II LLC | Wind | Burleigh | 50 MW | 201 GWh | 46% | 2009 |
| Jamestown | Oil | Stutsman | 48 MW | 1.2 GWh | 0% | 1976 |
| FPL Energy Oliver Wind II LLC | Wind | Oliver | 48 MW | 190 GWh | 45% | 2007 |
| Ashtabula Wind Energy Center | Wind | Barnes | 48 MW | 89 GWh | 21% | 2008 |
| Langdon Wind II LLC | Wind | Cavalier | 41 MW | 175 GWh | 49% | 2008 |
| Langdon Wind Energy Center | Wind | Cavalier | 41 MW | 173 GWh | 49% | 2007 |
| Cedar Hills Wind Farm | Wind | Bowman | 20 MW | 48 GWh | 28% | 2010 |
| American Crystal Sugar Hillsboro | Coal | Traill | 13 MW | 85 GWh | 73% | 1990 |
| Velva Windfarm LLC | Wind | McHenry | 12 MW | 20 GWh | 19% | 2005 |
| Enderlin | Biomass | Ransom | 9.8 MW | 0.0 GWh | – | 1983 |
| Tesoro Mandan Cogeneration Plant | Other | Morton | 9.3 MW | 58 GWh | 71% | 1954 |
| American Crystal Sugar Drayton | Coal | Pembina | 6.0 MW | 43 GWh | 81% | 1965 |
| Minot Wind Project | Wind | Ward | 4.5 MW | 0.0 GWh | – | 2009 |
| Grafton | Oil | Walsh | 4.0 MW | 0.0 GWh | – | 1937 |
| Hillsboro | Oil | Traill | 4.0 MW | 0.0 GWh | – | 2002 |
| Marvin Composites | Natural gas | Cass | 2.5 MW | – | – | 1996 |
| Kindred School | Oil | Cass | 2.0 MW | 0.2 GWh | 1% | 2001 |
| Dakota Magic | Oil | Richland | 1.5 MW | 0.0 GWh | – | 2000 |
Coming next
Planned projects
The largest generators reported as planned in North Dakota, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Bison Generation Station | Natural gas | Williams | 496 MW | 2029 |
| Bison Generation Station | Natural gas | Williams | 496 MW | 2030 |
| Abercrombie Solar | Solar | Richland | 295 MW | 2028 |
| Bison Generation Station | Natural gas | Williams | 263 MW | 2029 |
| Bison Generation Station | Natural gas | Williams | 263 MW | 2030 |
| New Salem Wind II | Wind | Morton | 226 MW | 2028 |
| Red Butte Wind | Wind | Morton | 202 MW | 2027 |
| New Salem Wind I | Wind | Morton | 200 MW | 2028 |
| Emmons-Logan Energy Storage | Storage | Emmons | 140 MW | 2026 |
| Northern Divide Energy Storage | Storage | Burke | 100 MW | 2026 |
Shut down
Retired since 2010
The largest generators retired in North Dakota since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| Stanton | Coal | 190 MW | 2017 |
| R M Heskett | Coal | 75 MW | 2022 |
| R M Heskett | Coal | 40 MW | 2022 |
| Glen Ullin Station 6 | Other | 5.3 MW | 2026 |
| Williston | Natural gas | 5.0 MW | 2012 |
| Williston | Natural gas | 5.0 MW | 2012 |
| Minot Wind Project | Wind | 2.6 MW | 2022 |
| Coal Creek | Oil | 2.0 MW | 2016 |
| Walhalla | Coal | 2.0 MW | 2012 |
| Harwood | Oil | 1.6 MW | 2012 |
| Harwood | Oil | 1.6 MW | 2012 |
| Grand Forks | Oil | 1.1 MW | 2012 |
| Grand Forks | Oil | 1.1 MW | 2012 |
| Grand Forks | Oil | 1.1 MW | 2012 |
| Grand Forks | Oil | 1.1 MW | 2012 |
| Grand Forks | Oil | 1.1 MW | 2012 |
| Pembina Land Port of Entry Wind Turbine | Wind | 1.0 MW | 2022 |
| Stanton | Oil | 1.0 MW | 2017 |
| Grand Forks | Oil | 1.0 MW | 2012 |
| Grand Forks | Oil | 1.0 MW | 2012 |
| Grand Forks | Oil | 1.0 MW | 2012 |
| Grand Forks | Oil | 0.7 MW | 2012 |
| Grand Forks | Oil | 0.7 MW | 2012 |
| Grand Forks | Oil | 0.7 MW | 2012 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.