Wind power plant · Stark, ND
Brady II Wind Energy Center
Brady II Wind Energy Center is a 150 MW wind power plant in Stark County, North Dakota, operated by Brady Wind II, LLC. Its oldest generator still running came online in 2016. In 2025 it generated 641 GWh, about what 50,000 average North Dakota homes use in a year.
Brady II Wind Energy Center in context
Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 14th largest, about 3.0% of the state's 5.0 GW of wind capacity.
Stark County has 2 power plants of 1 MW or more with 300 MW in all; Brady II Wind Energy Center is 50% of that and the largest of 2 wind plants there.
Its capacity factor of 49% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Stark County goes 0.5 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Brady II Wind Energy Center (outlined) and other plants in Stark County, shaded. 46.612, -102.788.
Plant facts
- Operator
- Brady Wind II, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Stark County, ND
- EIA plant ID
- 60354
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BWEC2 | Onshore Wind Turbine | 150 MW | 2016 | – |
Nearby
Other plants in Stark County
Questions
Brady II Wind Energy Center, answered
How much power does Brady II Wind Energy Center produce?
Brady II Wind Energy Center has 150 MW of capacity from one generator. In 2025 it generated 641 GWh, 49% of the most it could have made running flat out all year (its capacity factor).
How many homes does Brady II Wind Energy Center power?
Its 2025 output of 641 GWh equals the yearly electricity use of about 50,000 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Brady II Wind Energy Center?
Brady II Wind Energy Center is in Stark County, North Dakota, at about 46.612°, -102.788°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Stark County goes 0.5 hours a year without power. The county's page has the full outage record.
Who operates Brady II Wind Energy Center?
It is operated by Brady Wind II, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Brady II Wind Energy Center open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.