Wind power plant · Bowman, ND

Cedar Hills Wind Farm

Cedar Hills Wind Farm is a 20 MW wind power plant in Bowman County, North Dakota, operated by Montana-Dakota Utilities Co. Its oldest generator still running came online in 2010. In 2025 it generated 48 GWh, about what 3,700 average North Dakota homes use in a year.

Capacity20 MWNameplate, September 2026
Generated48 GWhIn 2025
Capacity factor28%Share of the most it could make, 2025
Generators1Oldest from 2010

Cedar Hills Wind Farm in context

Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 40th largest, about 0.4% of the state's 5.0 GW of wind capacity.

Bowman County has 2 power plants of 1 MW or more with 220 MW in all; Cedar Hills Wind Farm is 9% of that and the 2nd largest of 2 wind plants there.

Its capacity factor of 28% in 2025 is lower than the 32% typical for wind plants across the US.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608020182019202020212022202320242025GWh 48
020406080201920212023202548

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Cedar Hills Wind Farm (outlined) and other plants in Bowman County, shaded. 46.246, -103.767.

Plant facts

Operator
Montana-Dakota Utilities Co
Sector
Electric Utility
Grid operator
MISO
County
Bowman County, ND
EIA plant ID
57171
Where North Dakota's power comes from → North Dakota power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 20 MW 2010 –

Nearby

Other plants in Bowman County

Questions

Cedar Hills Wind Farm, answered

How much power does Cedar Hills Wind Farm produce?

Cedar Hills Wind Farm has 20 MW of capacity from one generator. In 2025 it generated 48 GWh, 28% of the most it could have made running flat out all year (its capacity factor).

How many homes does Cedar Hills Wind Farm power?

Its 2025 output of 48 GWh equals the yearly electricity use of about 3,700 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Cedar Hills Wind Farm?

Cedar Hills Wind Farm is in Bowman County, North Dakota, at about 46.246°, -103.767°. It is one of 2 power plants of 1 MW or more in the county.

Who operates Cedar Hills Wind Farm?

It is operated by Montana-Dakota Utilities Co (EIA sector: Electric Utility), and it feeds MISO.

When did Cedar Hills Wind Farm open?

Its oldest generator still running came online in 2010.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.