Wind power plant · Bowman, ND
Cedar Hills Wind Farm
Cedar Hills Wind Farm is a 20 MW wind power plant in Bowman County, North Dakota, operated by Montana-Dakota Utilities Co. Its oldest generator still running came online in 2010. In 2025 it generated 48 GWh, about what 3,700 average North Dakota homes use in a year.
Cedar Hills Wind Farm in context
Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 40th largest, about 0.4% of the state's 5.0 GW of wind capacity.
Bowman County has 2 power plants of 1 MW or more with 220 MW in all; Cedar Hills Wind Farm is 9% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 28% in 2025 is lower than the 32% typical for wind plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cedar Hills Wind Farm (outlined) and other plants in Bowman County, shaded. 46.246, -103.767.
Plant facts
- Operator
- Montana-Dakota Utilities Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Bowman County, ND
- EIA plant ID
- 57171
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 20 MW | 2010 | – |
Nearby
Other plants in Bowman County
Questions
Cedar Hills Wind Farm, answered
How much power does Cedar Hills Wind Farm produce?
Cedar Hills Wind Farm has 20 MW of capacity from one generator. In 2025 it generated 48 GWh, 28% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cedar Hills Wind Farm power?
Its 2025 output of 48 GWh equals the yearly electricity use of about 3,700 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cedar Hills Wind Farm?
Cedar Hills Wind Farm is in Bowman County, North Dakota, at about 46.246°, -103.767°. It is one of 2 power plants of 1 MW or more in the county.
Who operates Cedar Hills Wind Farm?
It is operated by Montana-Dakota Utilities Co (EIA sector: Electric Utility), and it feeds MISO.
When did Cedar Hills Wind Farm open?
Its oldest generator still running came online in 2010.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.