Wind power plant · Dickey, ND

Tatanka Wind Power LLC

Tatanka Wind Power LLC is a 180 MW wind power plant in Dickey County, North Dakota, operated by Acciona Wind Energy USA LLC. Its oldest generator still running came online in 2008. In 2025 it generated 476 GWh, about what 37,000 average North Dakota homes use in a year.

Capacity180 MWNameplate, September 2026
Generated476 GWhIn 2025
Capacity factor30%Share of the most it could make, 2025
Generators1Oldest from 2008

Tatanka Wind Power LLC in context

Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 9th largest, about 3.6% of the state's 5.0 GW of wind capacity.

Dickey County has 2 power plants of 1 MW or more with 330 MW in all; Tatanka Wind Power LLC is 55% of that and the largest of 2 wind plants there.

Its capacity factor of 30% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Dickey County goes 9.3 hours a year without power, the 6th most of 13 counties in North Dakota. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 476
02004006008002019202120232025476

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Tatanka Wind Power LLC (outlined) and other plants in Dickey County, shaded. 45.959, -98.946.

Plant facts

Operator
Acciona Wind Energy USA LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Dickey County, ND
EIA plant ID
56669
Where North Dakota's power comes from → North Dakota power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
TW1 Onshore Wind Turbine 180 MW 2008 –

Nearby

Other plants in Dickey County

Questions

Tatanka Wind Power LLC, answered

How much power does Tatanka Wind Power LLC produce?

Tatanka Wind Power LLC has 180 MW of capacity from one generator. In 2025 it generated 476 GWh, 30% of the most it could have made running flat out all year (its capacity factor).

How many homes does Tatanka Wind Power LLC power?

Its 2025 output of 476 GWh equals the yearly electricity use of about 37,000 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Tatanka Wind Power LLC?

Tatanka Wind Power LLC is in Dickey County, North Dakota, at about 45.959°, -98.946°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Dickey County goes 9.3 hours a year without power, the 6th most of 13 counties in North Dakota. The county's page has the full outage record.

Who operates Tatanka Wind Power LLC?

It is operated by Acciona Wind Energy USA LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Tatanka Wind Power LLC open?

Its oldest generator still running came online in 2008.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.