Wind power plant · Morton, ND
Bison I Wind Energy Center
Bison I Wind Energy Center is a 82 MW wind power plant in Morton County, North Dakota, operated by ALLETE, Inc.. Its oldest generator still running came online in 2010. In 2025 it generated 197 GWh, about what 15,000 average North Dakota homes use in a year.
Bison I Wind Energy Center in context
Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 29th largest, about 1.6% of the state's 5.0 GW of wind capacity.
Morton County has 9 power plants of 1 MW or more with 994 MW in all; Bison I Wind Energy Center is 8% of that and the 7th largest of 7 wind plants there.
Its capacity factor of 27% in 2025 is lower than the 32% typical for wind plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Bison I Wind Energy Center (outlined) and other plants in Morton County, shaded. 46.980, -101.555.
Plant facts
- Operator
- ALLETE, Inc.
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Morton County, ND
- EIA plant ID
- 57038
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PHS2 | Onshore Wind Turbine | 45 MW | 2012 | – |
| PHS1 | Onshore Wind Turbine | 37 MW | 2010 | – |
Nearby
Other plants in Morton County
Questions
Bison I Wind Energy Center, answered
How much power does Bison I Wind Energy Center produce?
Bison I Wind Energy Center has 82 MW of capacity from 2 generators. In 2025 it generated 197 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Bison I Wind Energy Center power?
Its 2025 output of 197 GWh equals the yearly electricity use of about 15,000 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Bison I Wind Energy Center?
Bison I Wind Energy Center is in Morton County, North Dakota, at about 46.980°, -101.555°. It is one of 9 power plants of 1 MW or more in the county.
Who operates Bison I Wind Energy Center?
It is operated by ALLETE, Inc. (EIA sector: Electric Utility), and it feeds MISO.
When did Bison I Wind Energy Center open?
Its oldest generator still running came online in 2010.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.