Wind power plant · Morton, ND
Oliver Wind III, LLC
Oliver Wind III, LLC is a 99 MW wind power plant in Morton County, North Dakota, operated by Oliver Wind III, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 380 GWh, about what 30,000 average North Dakota homes use in a year.
Oliver Wind III, LLC in context
Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 28th largest, about 2.0% of the state's 5.0 GW of wind capacity.
Morton County has 9 power plants of 1 MW or more with 994 MW in all; Oliver Wind III, LLC is 10% of that and the 6th largest of 7 wind plants there.
Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Oliver Wind III, LLC (outlined) and other plants in Morton County, shaded. 46.957, -101.168.
Plant facts
- Operator
- Oliver Wind III, LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Morton County, ND
- EIA plant ID
- 60905
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | 99 MW | 2017 | – |
Nearby
Other plants in Morton County
Questions
Oliver Wind III, LLC, answered
How much power does Oliver Wind III, LLC produce?
Oliver Wind III, LLC has 99 MW of capacity from one generator. In 2025 it generated 380 GWh, 44% of the most it could have made running flat out all year (its capacity factor).
How many homes does Oliver Wind III, LLC power?
Its 2025 output of 380 GWh equals the yearly electricity use of about 30,000 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Oliver Wind III, LLC?
Oliver Wind III, LLC is in Morton County, North Dakota, at about 46.957°, -101.168°. It is one of 9 power plants of 1 MW or more in the county.
Who operates Oliver Wind III, LLC?
It is operated by Oliver Wind III, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Oliver Wind III, LLC open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.