Wind power plant · Oliver, ND
Oliver Wind IV
Oliver Wind IV is a 199 MW wind power plant in Oliver County, North Dakota, operated by Oliver Wind IV, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 800 GWh, about what 62,000 average North Dakota homes use in a year.
Oliver Wind IV in context
Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 8th largest, about 4.0% of the state's 5.0 GW of wind capacity.
Oliver County has 4 power plants of 1 MW or more with 1.0 GW in all; Oliver Wind IV is 19% of that and the largest of 3 wind plants there.
Its capacity factor of 46% in 2025 is higher than the 32% typical for wind plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Oliver Wind IV (outlined) and other plants in Oliver County, shaded. 47.124, -101.612.
Plant facts
- Operator
- Oliver Wind IV, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Oliver County, ND
- EIA plant ID
- 67502
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN4 | Onshore Wind Turbine | 199 MW | 2024 | – |
Nearby
Other plants in Oliver County
Questions
Oliver Wind IV, answered
How much power does Oliver Wind IV produce?
Oliver Wind IV has 199 MW of capacity from one generator. In 2025 it generated 800 GWh, 46% of the most it could have made running flat out all year (its capacity factor).
How many homes does Oliver Wind IV power?
Its 2025 output of 800 GWh equals the yearly electricity use of about 62,000 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Oliver Wind IV?
Oliver Wind IV is in Oliver County, North Dakota, at about 47.124°, -101.612°. It is one of 4 power plants of 1 MW or more in the county.
Who operates Oliver Wind IV?
It is operated by Oliver Wind IV, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Oliver Wind IV open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.