Wind power plant · Oliver, ND

FPL Energy Oliver Wind II LLC

FPL Energy Oliver Wind II LLC is a 48 MW wind power plant in Oliver County, North Dakota, operated by FPL Energy Oliver County Wind II LLC. Its oldest generator still running came online in 2007. In 2025 it generated 190 GWh, about what 15,000 average North Dakota homes use in a year.

Capacity48 MWNameplate, September 2026
Generated190 GWhIn 2025
Capacity factor45%Share of the most it could make, 2025
Generators1Oldest from 2007

FPL Energy Oliver Wind II LLC in context

Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 36th largest, about 1.0% of the state's 5.0 GW of wind capacity.

Oliver County has 4 power plants of 1 MW or more with 1.0 GW in all; FPL Energy Oliver Wind II LLC is 5% of that and the 3rd largest of 3 wind plants there.

Its capacity factor of 45% in 2025 is higher than the 32% typical for wind plants across the US.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020025020182019202020212022202320242025GWh 190
0501001502002502019202120232025190

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

FPL Energy Oliver Wind II LLC (outlined) and other plants in Oliver County, shaded. 47.153, -101.198.

Plant facts

Operator
FPL Energy Oliver County Wind II LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Oliver County, ND
EIA plant ID
56573
Where North Dakota's power comes from → North Dakota power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
2 Onshore Wind Turbine 48 MW 2007 –

Questions

FPL Energy Oliver Wind II LLC, answered

How much power does FPL Energy Oliver Wind II LLC produce?

FPL Energy Oliver Wind II LLC has 48 MW of capacity from one generator. In 2025 it generated 190 GWh, 45% of the most it could have made running flat out all year (its capacity factor).

How many homes does FPL Energy Oliver Wind II LLC power?

Its 2025 output of 190 GWh equals the yearly electricity use of about 15,000 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is FPL Energy Oliver Wind II LLC?

FPL Energy Oliver Wind II LLC is in Oliver County, North Dakota, at about 47.153°, -101.198°. It is one of 4 power plants of 1 MW or more in the county.

Who operates FPL Energy Oliver Wind II LLC?

It is operated by FPL Energy Oliver County Wind II LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did FPL Energy Oliver Wind II LLC open?

Its oldest generator still running came online in 2007.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.