Wind power plant · Williams, ND
Aurora Wind Project
Aurora Wind Project is a 299 MW wind power plant in Williams County, North Dakota, operated by Aurora Wind Project, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 913 GWh, about what 71,000 average North Dakota homes use in a year.
Aurora Wind Project in context
Among the 42 wind plants in North Dakota in the EIA's inventory, it is the largest, about 6.0% of the state's 5.0 GW of wind capacity.
Williams County has 3 power plants of 1 MW or more with 1.3 GW in all; Aurora Wind Project is 22% of that and the largest of 2 wind plants there.
Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Williams County goes 3.4 hours a year without power, the 9th most of 13 counties in North Dakota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Aurora Wind Project (outlined) and other plants in Williams County, shaded. 48.500, -103.100.
Plant facts
- Operator
- Aurora Wind Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Williams County, ND
- EIA plant ID
- 63258
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| AURWP | Onshore Wind Turbine | 299 MW | 2021 | – |
Nearby
Other plants in Williams County
Questions
Aurora Wind Project, answered
How much power does Aurora Wind Project produce?
Aurora Wind Project has 299 MW of capacity from one generator. In 2025 it generated 913 GWh, 35% of the most it could have made running flat out all year (its capacity factor).
How many homes does Aurora Wind Project power?
Its 2025 output of 913 GWh equals the yearly electricity use of about 71,000 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Aurora Wind Project?
Aurora Wind Project is in Williams County, North Dakota, at about 48.500°, -103.100°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Williams County goes 3.4 hours a year without power, the 9th most of 13 counties in North Dakota. The county's page has the full outage record.
Who operates Aurora Wind Project?
It is operated by Aurora Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Aurora Wind Project open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.