Wind power plant · Pierce, ND
Rugby Wind Power Project
Rugby Wind Power Project is a 149 MW wind power plant in Pierce County, North Dakota, operated by Avangrid Power LLC. Its oldest generator still running came online in 2009. In 2025 it generated 348 GWh, about what 27,000 average North Dakota homes use in a year.
Rugby Wind Power Project in context
Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 17th largest, about 3.0% of the state's 5.0 GW of wind capacity.
Its capacity factor of 27% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Pierce County goes 0.4 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Rugby Wind Power Project (outlined) and other plants in Pierce County, shaded. 48.497, -99.951.
Plant facts
- Operator
- Avangrid Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Pierce County, ND
- EIA plant ID
- 57097
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 149 MW | 2009 | – |
Questions
Rugby Wind Power Project, answered
How much power does Rugby Wind Power Project produce?
Rugby Wind Power Project has 149 MW of capacity from one generator. In 2025 it generated 348 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Rugby Wind Power Project power?
Its 2025 output of 348 GWh equals the yearly electricity use of about 27,000 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Rugby Wind Power Project?
Rugby Wind Power Project is in Pierce County, North Dakota, at about 48.497°, -99.951°. The average electricity customer in Pierce County goes 0.4 hours a year without power. The county's page has the full outage record.
Who operates Rugby Wind Power Project?
It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Rugby Wind Power Project open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.