Wind power plant · Barnes, ND
Ashtabula Wind III LLC
Ashtabula Wind III LLC is a 62 MW wind power plant in Barnes County, North Dakota, operated by Otter Tail Power Co. Its oldest generator still running came online in 2010. In 2025 it generated 120 GWh, about what 9,300 average North Dakota homes use in a year.
Ashtabula Wind III LLC in context
Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 30th largest, about 1.3% of the state's 5.0 GW of wind capacity.
Barnes County has 3 power plants of 1 MW or more with 259 MW in all; Ashtabula Wind III LLC is 24% of that and the 2nd largest of 3 wind plants there.
Its capacity factor of 22% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Barnes County goes 6.9 hours a year without power, the 7th most of 13 counties in North Dakota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Ashtabula Wind III LLC (outlined) and other plants in Barnes County, shaded. 47.124, -97.896.
Plant facts
- Operator
- Otter Tail Power Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Barnes County, ND
- EIA plant ID
- 57387
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GE16 | Onshore Wind Turbine | 62 MW | 2010 | – |
Nearby
Other plants in Barnes County
Questions
Ashtabula Wind III LLC, answered
How much power does Ashtabula Wind III LLC produce?
Ashtabula Wind III LLC has 62 MW of capacity from one generator. In 2025 it generated 120 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Ashtabula Wind III LLC power?
Its 2025 output of 120 GWh equals the yearly electricity use of about 9,300 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Ashtabula Wind III LLC?
Ashtabula Wind III LLC is in Barnes County, North Dakota, at about 47.124°, -97.896°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Barnes County goes 6.9 hours a year without power, the 7th most of 13 counties in North Dakota. The county's page has the full outage record.
Who operates Ashtabula Wind III LLC?
It is operated by Otter Tail Power Co (EIA sector: Electric Utility), and it feeds MISO.
When did Ashtabula Wind III LLC open?
Its oldest generator still running came online in 2010.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.