Wind power plant · Barnes, ND
Ashtabula Wind Energy Center
Ashtabula Wind Energy Center is a 48 MW wind power plant in Barnes County, North Dakota, operated by Otter Tail Power Co. Its oldest generator still running came online in 2008. In 2025 it generated 89 GWh, about what 6,900 average North Dakota homes use in a year.
Ashtabula Wind Energy Center in context
Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 37th largest, about 1.0% of the state's 5.0 GW of wind capacity.
Barnes County has 3 power plants of 1 MW or more with 259 MW in all; Ashtabula Wind Energy Center is 19% of that and the 3rd largest of 3 wind plants there.
Its capacity factor of 21% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Barnes County goes 6.9 hours a year without power, the 7th most of 13 counties in North Dakota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Ashtabula Wind Energy Center (outlined) and other plants in Barnes County, shaded. 47.124, -97.896.
Plant facts
- Operator
- Otter Tail Power Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Barnes County, ND
- EIA plant ID
- 57032
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 48 MW | 2008 | – |
Nearby
Other plants in Barnes County
Questions
Ashtabula Wind Energy Center, answered
How much power does Ashtabula Wind Energy Center produce?
Ashtabula Wind Energy Center has 48 MW of capacity from one generator. In 2025 it generated 89 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Ashtabula Wind Energy Center power?
Its 2025 output of 89 GWh equals the yearly electricity use of about 6,900 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Ashtabula Wind Energy Center?
Ashtabula Wind Energy Center is in Barnes County, North Dakota, at about 47.124°, -97.896°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Barnes County goes 6.9 hours a year without power, the 7th most of 13 counties in North Dakota. The county's page has the full outage record.
Who operates Ashtabula Wind Energy Center?
It is operated by Otter Tail Power Co (EIA sector: Electric Utility), and it feeds MISO.
When did Ashtabula Wind Energy Center open?
Its oldest generator still running came online in 2008.