Wind power plant · Stutsman, ND
Courtenay Wind Farm
Courtenay Wind Farm is a 200 MW wind power plant in Stutsman County, North Dakota, operated by Northern States Power Co - Minnesota. Its oldest generator still running came online in 2016. In 2025 it generated 423 GWh, about what 33,000 average North Dakota homes use in a year.
Courtenay Wind Farm in context
Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 4th largest, about 4.0% of the state's 5.0 GW of wind capacity.
Stutsman County has 3 power plants of 1 MW or more with 354 MW in all; Courtenay Wind Farm is 56% of that.
Its capacity factor of 24% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Stutsman County goes 20 hours a year without power, the 1st most of 13 counties in North Dakota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Courtenay Wind Farm (outlined) and other plants in Stutsman County, shaded. 47.180, -98.595.
Plant facts
- Operator
- Northern States Power Co - Minnesota
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Stutsman County, ND
- EIA plant ID
- 58658
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 200 MW | 2016 | – |
Nearby
Other plants in Stutsman County
Questions
Courtenay Wind Farm, answered
How much power does Courtenay Wind Farm produce?
Courtenay Wind Farm has 200 MW of capacity from one generator. In 2025 it generated 423 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Courtenay Wind Farm power?
Its 2025 output of 423 GWh equals the yearly electricity use of about 33,000 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Courtenay Wind Farm?
Courtenay Wind Farm is in Stutsman County, North Dakota, at about 47.180°, -98.595°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Stutsman County goes 20 hours a year without power, the 1st most of 13 counties in North Dakota. The county's page has the full outage record.
Who operates Courtenay Wind Farm?
It is operated by Northern States Power Co - Minnesota (EIA sector: Electric Utility), and it feeds MISO.
When did Courtenay Wind Farm open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.