Wind power plant · McIntosh, ND
Merricourt Wind Energy Center
Merricourt Wind Energy Center is a 150 MW wind power plant in McIntosh County, North Dakota, operated by Otter Tail Power Co. Its oldest generator still running came online in 2020. In 2025 it generated 584 GWh, about what 45,000 average North Dakota homes use in a year.
Merricourt Wind Energy Center in context
Among the 42 wind plants in North Dakota in the EIA's inventory, it is the 11th largest, about 3.0% of the state's 5.0 GW of wind capacity.
McIntosh County has 2 power plants of 1 MW or more with 400 MW in all; Merricourt Wind Energy Center is 38% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in McIntosh County goes 2.2 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Merricourt Wind Energy Center (outlined) and other plants in McIntosh County, shaded. 46.108, -99.059.
Plant facts
- Operator
- Otter Tail Power Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- McIntosh County, ND
- EIA plant ID
- 57048
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 150 MW | 2020 | – |
Nearby
Other plants in McIntosh County
Questions
Merricourt Wind Energy Center, answered
How much power does Merricourt Wind Energy Center produce?
Merricourt Wind Energy Center has 150 MW of capacity from one generator. In 2025 it generated 584 GWh, 44% of the most it could have made running flat out all year (its capacity factor).
How many homes does Merricourt Wind Energy Center power?
Its 2025 output of 584 GWh equals the yearly electricity use of about 45,000 average North Dakota homes (1,070 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Merricourt Wind Energy Center?
Merricourt Wind Energy Center is in McIntosh County, North Dakota, at about 46.108°, -99.059°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in McIntosh County goes 2.2 hours a year without power. The county's page has the full outage record.
Who operates Merricourt Wind Energy Center?
It is operated by Otter Tail Power Co (EIA sector: Electric Utility), and it feeds MISO.
When did Merricourt Wind Energy Center open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average North Dakota home's 1,070 kWh a month in 2025. Methodology.