Solar power plant · Shiawassee, MI

Assembly Solar II LLC

Assembly Solar II LLC is a 110 MW solar power plant in Shiawassee County, Michigan, operated by Assembly Solar II LLC. Its oldest generator still running came online in 2021. In 2025 it generated 226 GWh, about what 30,000 average Michigan homes use in a year.

Capacity110 MWNameplate, September 2026
Generated226 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators1Oldest from 2021

Assembly Solar II LLC in context

Among the 79 solar plants in Michigan in the EIA's inventory, it is the 13th largest, about 3.3% of the state's 3.3 GW of solar capacity.

Shiawassee County has 7 power plants of 1 MW or more with 287 MW in all; Assembly Solar II LLC is 38% of that and the largest of 5 solar plants there.

Its capacity factor of 23% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Shiawassee County goes 7.0 hours a year without power, the 69th most of 83 counties in Michigan. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020025020212022202320242025GWh 226
05010015020025020212022202320242025226

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Assembly Solar II LLC (outlined) and other plants in Shiawassee County, shaded. 43.044, -83.960.

Plant facts

Operator
Assembly Solar II LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Shiawassee County, MI
EIA plant ID
63538
Where Michigan's power comes from → Michigan power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
AS2 Solar Photovoltaic 110 MW 2021 –

Nearby

Other plants in Shiawassee County

Questions

Assembly Solar II LLC, answered

How much power does Assembly Solar II LLC produce?

Assembly Solar II LLC has 110 MW of capacity from one generator. In 2025 it generated 226 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Assembly Solar II LLC power?

Its 2025 output of 226 GWh equals the yearly electricity use of about 30,000 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Assembly Solar II LLC?

Assembly Solar II LLC is in Shiawassee County, Michigan, at about 43.044°, -83.960°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Shiawassee County goes 7.0 hours a year without power, the 69th most of 83 counties in Michigan. The county's page has the full outage record.

Who operates Assembly Solar II LLC?

It is operated by Assembly Solar II LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Assembly Solar II LLC open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.