Solar power plant · Shiawassee, MI

Assembly Solar Project

Assembly Solar Project is a 50 MW solar power plant in Shiawassee County, Michigan, operated by Assembly Solar I, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 100 GWh, about what 13,000 average Michigan homes use in a year.

Capacity50 MWNameplate, September 2026
Generated100 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators1Oldest from 2020

Assembly Solar Project in context

Among the 79 solar plants in Michigan in the EIA's inventory, it is the 21st largest, about 1.5% of the state's 3.3 GW of solar capacity.

Shiawassee County has 7 power plants of 1 MW or more with 287 MW in all; Assembly Solar Project is 17% of that and the 3rd largest of 5 solar plants there.

Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Shiawassee County goes 7.0 hours a year without power, the 69th most of 83 counties in Michigan. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020406080100120202020212022202320242025GWh 100
020406080100120202020212022202320242025100

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Assembly Solar Project (outlined) and other plants in Shiawassee County, shaded. 43.023, -83.945.

Plant facts

Operator
Assembly Solar I, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Shiawassee County, MI
EIA plant ID
62422
Where Michigan's power comes from → Michigan power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ASP01 Solar Photovoltaic 50 MW 2020 –

Nearby

Other plants in Shiawassee County

Questions

Assembly Solar Project, answered

How much power does Assembly Solar Project produce?

Assembly Solar Project has 50 MW of capacity from one generator. In 2025 it generated 100 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Assembly Solar Project power?

Its 2025 output of 100 GWh equals the yearly electricity use of about 13,000 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Assembly Solar Project?

Assembly Solar Project is in Shiawassee County, Michigan, at about 43.023°, -83.945°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Shiawassee County goes 7.0 hours a year without power, the 69th most of 83 counties in Michigan. The county's page has the full outage record.

Who operates Assembly Solar Project?

It is operated by Assembly Solar I, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Assembly Solar Project open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.