Solar power plant · Shiawassee, MI
Assembly Solar Project
Assembly Solar Project is a 50 MW solar power plant in Shiawassee County, Michigan, operated by Assembly Solar I, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 100 GWh, about what 13,000 average Michigan homes use in a year.
Assembly Solar Project in context
Among the 79 solar plants in Michigan in the EIA's inventory, it is the 21st largest, about 1.5% of the state's 3.3 GW of solar capacity.
Shiawassee County has 7 power plants of 1 MW or more with 287 MW in all; Assembly Solar Project is 17% of that and the 3rd largest of 5 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Shiawassee County goes 7.0 hours a year without power, the 69th most of 83 counties in Michigan. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Assembly Solar Project (outlined) and other plants in Shiawassee County, shaded. 43.023, -83.945.
Plant facts
- Operator
- Assembly Solar I, LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Shiawassee County, MI
- EIA plant ID
- 62422
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ASP01 | Solar Photovoltaic | 50 MW | 2020 | – |
Nearby
Other plants in Shiawassee County
Questions
Assembly Solar Project, answered
How much power does Assembly Solar Project produce?
Assembly Solar Project has 50 MW of capacity from one generator. In 2025 it generated 100 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Assembly Solar Project power?
Its 2025 output of 100 GWh equals the yearly electricity use of about 13,000 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Assembly Solar Project?
Assembly Solar Project is in Shiawassee County, Michigan, at about 43.023°, -83.945°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Shiawassee County goes 7.0 hours a year without power, the 69th most of 83 counties in Michigan. The county's page has the full outage record.
Who operates Assembly Solar Project?
It is operated by Assembly Solar I, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Assembly Solar Project open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.