Wind power plant · Throckmorton, TX
Azure Sky Wind Project, LLC Hybrid
Azure Sky Wind Project, LLC Hybrid is a 470 MW wind power plant in Throckmorton County, Texas, operated by Azure Sky Wind Project, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 1.2 TWh, about what 91,000 average Texas homes use in a year.
Azure Sky Wind Project, LLC Hybrid in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 10th largest, about 1.0% of the state's 45 GW of wind capacity.
Throckmorton County has 2 power plants of 1 MW or more with 679 MW in all; Azure Sky Wind Project, LLC Hybrid is 69% of that and the largest of 2 wind plants there.
Its capacity factor of 29% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Throckmorton County goes 16 hours a year without power, the 68th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Azure Sky Wind Project, LLC Hybrid (outlined) and other plants in Throckmorton County, shaded. 33.169, -99.266.
Plant facts
- Operator
- Azure Sky Wind Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Throckmorton County, TX
- EIA plant ID
- 64164
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ASWWT | Onshore Wind Turbine | 350 MW | 2024 | – |
| ASWBE | Batteries | 120 MW · 190 MWh | 2023 | – |
Nearby
Other plants in Throckmorton County
Questions
Azure Sky Wind Project, LLC Hybrid, answered
How much power does Azure Sky Wind Project, LLC Hybrid produce?
Azure Sky Wind Project, LLC Hybrid has 470 MW of capacity from 2 generators. In 2025 it generated 1.2 TWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does Azure Sky Wind Project, LLC Hybrid power?
Its 2025 output of 1.2 TWh equals the yearly electricity use of about 91,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Azure Sky Wind Project, LLC Hybrid?
Azure Sky Wind Project, LLC Hybrid is in Throckmorton County, Texas, at about 33.169°, -99.266°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Throckmorton County goes 16 hours a year without power, the 68th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Azure Sky Wind Project, LLC Hybrid?
It is operated by Azure Sky Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Azure Sky Wind Project, LLC Hybrid open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.