Wind power plant · Throckmorton, TX

Azure Sky Wind Project, LLC Hybrid

Azure Sky Wind Project, LLC Hybrid is a 470 MW wind power plant in Throckmorton County, Texas, operated by Azure Sky Wind Project, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 1.2 TWh, about what 91,000 average Texas homes use in a year.

Capacity470 MWNameplate, September 2026
Generated1.2 TWhIn 2025
Capacity factor29%Share of the most it could make, 2025
Generators2Oldest from 2023

Azure Sky Wind Project, LLC Hybrid in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 10th largest, about 1.0% of the state's 45 GW of wind capacity.

Throckmorton County has 2 power plants of 1 MW or more with 679 MW in all; Azure Sky Wind Project, LLC Hybrid is 69% of that and the largest of 2 wind plants there.

Its capacity factor of 29% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Throckmorton County goes 16 hours a year without power, the 68th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05001,0001,500202320242025GWh 1,207
05001,0001,5002023202420251,207

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Azure Sky Wind Project, LLC Hybrid (outlined) and other plants in Throckmorton County, shaded. 33.169, -99.266.

Plant facts

Operator
Azure Sky Wind Project, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Throckmorton County, TX
EIA plant ID
64164
  • Wind350 MW74%
  • Storage120 MW26%
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ASWWT Onshore Wind Turbine 350 MW 2024 –
ASWBE Batteries 120 MW · 190 MWh 2023 –

Nearby

Other plants in Throckmorton County

Questions

Azure Sky Wind Project, LLC Hybrid, answered

How much power does Azure Sky Wind Project, LLC Hybrid produce?

Azure Sky Wind Project, LLC Hybrid has 470 MW of capacity from 2 generators. In 2025 it generated 1.2 TWh, 29% of the most it could have made running flat out all year (its capacity factor).

How many homes does Azure Sky Wind Project, LLC Hybrid power?

Its 2025 output of 1.2 TWh equals the yearly electricity use of about 91,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Azure Sky Wind Project, LLC Hybrid?

Azure Sky Wind Project, LLC Hybrid is in Throckmorton County, Texas, at about 33.169°, -99.266°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Throckmorton County goes 16 hours a year without power, the 68th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Azure Sky Wind Project, LLC Hybrid?

It is operated by Azure Sky Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Azure Sky Wind Project, LLC Hybrid open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.